Optimal Project Scheduling with Materials Ordering
16 references·8 citing·32 second hop
Optimal Project Scheduling with Materials Ordering (1987)Optimal Project Scheduling with Materials…Dynamic Version of the Economic Lot Size Model (2004)Dynamic Version of the Econom…An efficient implementation of the Wagner‐Whitin algorithm for dynamic lot‐sizing (1985)An efficient implementation o…Manufacturing Planning and Control Systems (1984)Manufacturing Planning and Co…Constrained resource project scheduling subject to material constraints (1984)Constrained resource project …A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A Comparison of Exact Approac…Production and inventory management (1983)Production and inventory mana…A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning (1980)A formal set of algorithms fo…Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach (1977)Scheduling a Project to Maxim…MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY (1976)MATERIAL REQUIREMENTS PLANNIN…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Project Scheduling under Reso…The payment scheduling problem (1972)The payment scheduling problemCash Flows in Networks (1970)Cash Flows in NetworksProduction-Inventory Systems: Planning and Control (1969)Production-Inventory Systems:…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Multiproject Scheduling with …Dynamic Version of the Economic Lot Size Model (1958)Dynamic Version of the Econom…Resource constrained project scheduling and material ordering problem with discounted cash flows (2021)Resource constrained project …Project scheduling and material ordering problem with storage space constraints (2021)Project scheduling and materi…A new approach for material ordering and multi-mode resource constraint project scheduling problem in a multi-site context under interval-valued fuzzy uncertainty (2021)A new approach for material o…Robust project scheduling integrated with materials ordering under activity duration uncertainty (2019)Robust project scheduling int…Integrated planning of project scheduling and material procurement considering the environmental impacts (2018)Integrated planning of projec…A hybrid project scheduling and material ordering problem: Modeling and solution algorithms (2017)A hybrid project scheduling a…Simultaneous planning of the project scheduling and material procurement problem under the presence of multiple suppliers (2015)Simultaneous planning of the …CONCURRENT PROJECT SCHEDULING AND MATERIAL PLANNING: A GENETIC ALGORITHM APPROACH (2009)CONCURRENT PROJECT SCHEDULING…Application of a Technique for Research and Development Program Evaluation (1959)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)A survey on the resource-constrained project scheduling problem (1995)Efficient priority rules for the resource‐constrained project scheduling problem (1996)Robust and reactive project scheduling: a review and classification of procedures (2004)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Project network models with discounted cash flows a guided tour through recent developments (1997)Solving Project Scheduling Problems by Minimum Cut Computations (2003)Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (2004)CONWIP: a pull alternative to kanban (1990)Models for production planning under uncertainty: A review (2006)The evolution of the intellectual structure of operations management—1980–2006: A citation/co‐citation analysis (2008)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Perishable Inventory Theory: A Review (1982)Network Design and Transportation Planning: Models and Algorithms (1984)Quantitative models for reverse logistics: A review (1997)Safety Stock versus Safety Time in MRP Controlled Production Systems (1994)Inventory lot-sizing with supplier selection (2003)Supply planning under uncertainties in MRP environments: A state of the art (2007)Project scheduling with resource constraints: A branch and bound approach (1987)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)A Cooperative Game Theory Model of Quantity Discounts (1989)Forecasting intermittent demand in manufacturing: a comparative evaluation of Croston's method (1994)A new approach to forecasting intermittent demand for service parts inventories (2003)Economic Production Cycles with Imperfect Production Processes (1986)The Distribution Free Newsboy Problem: Review and Extensions (1993)Quantifying the Bullwhip Effect in a Simple Supply Chain: The Impact of Forecasting, Lead Times, and Information (2000)Flow Coordination and Information Sharing in Supply Chains: Review, Implications, and Directions for Future Research (2002)Smart “Predict, then Optimize” (2021)
this work references cited by second hop

References

  • 1958Dynamic Version of the Economic Lot Size Model2,068 cited
  • 2004Dynamic Version of the Economic Lot Size Model2,055 cited
  • 1983Production and inventory management1,865 cited
  • 1984Manufacturing Planning and Control Systems1,029 cited
  • 1969Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach773 cited
  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1984A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem341 cited
  • 1976MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY291 cited
  • 1969Production-Inventory Systems: Planning and Control269 cited
  • 1970Cash Flows in Networks230 cited
  • 1973Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures211 cited
  • 1977Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach147 cited
  • 1972The payment scheduling problem119 cited
  • 1985An efficient implementation of the Wagner‐Whitin algorithm for dynamic lot‐sizing99 cited
  • 1980A formal set of algorithms for project scheduling with critical path scheduling/material requirements planning

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

84 cited
  • 1984Constrained resource project scheduling subject to material constraints67 cited
  • Cited by

    • 2018Integrated planning of project scheduling and material procurement considering the environmental impacts51 cited
    • 2017A hybrid project scheduling and material ordering problem: Modeling and solution algorithms46 cited
    • 2021A new approach for material ordering and multi-mode resource constraint project scheduling problem in a multi-site context under interval-valued fuzzy uncertainty44 cited
    • 2021Project scheduling and material ordering problem with storage space constraints42 cited
    • 2019Robust project scheduling integrated with materials ordering under activity duration uncertainty41 cited
    • 2021Resource constrained project scheduling and material ordering problem with discounted cash flows40 cited
    • 2009CONCURRENT PROJECT SCHEDULING AND MATERIAL PLANNING: A GENETIC ALGORITHM APPROACH36 cited
    • 2015Simultaneous planning of the project scheduling and material procurement problem under the presence of multiple suppliers35 cited