SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints
12 references·1 citing·33 second hop
Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraints (1995)Heuristics for the minimum project-durati…The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs) (1992)The Analysis of Activity Netw…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Branch-and-Bound Procedure …HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)HEURISTIC ALGORITHMS FOR RESO…AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS (1989)AN ALGORITHM FOR A GENERAL CL…Advances in project scheduling (1989)Advances in project schedulingScheduling project networks with resource constraints and time windows (1988)Scheduling project networks w…Project scheduling with resource constraints: A branch and bound approach (1987)Project scheduling with resou…A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A Comparison of Exact Approac…Multiple Resource–Constrained Scheduling Using Branch and Bound (1978)Multiple Resource–Constrained…An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems (1978)An Efficient Integer Programm…Project Network Summary Measures Constrained- Resource Scheduling (1975)Project Network Summary Measu…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (1998)An optimal procedure for the …Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Activity networks: Project planning and control by network models (1977)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Scheduling of Project Networks by Job Assignment (1991)The multi-mode resource-constrained project scheduling problem with generalized precedence relations (1999)Stochastic resource-constrained project scheduling (2001)A Network Flow Computation for Project Cost Curves (1961)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Activity nets: A guided tour through some recent developments (1995)A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (1998)Application of a Technique for Research and Development Program Evaluation (1959)Efficient priority rules for the resource‐constrained project scheduling problem (1996)Robust and reactive project scheduling: a review and classification of procedures (2004)An Efficient Branch and Bound Algorithm for the Warehouse Location Problem (1972)An Efficient Branch and Bound Algorithm for the Capacitated Warehouse Location Problem (1977)Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (1998)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)Critical-path planning and scheduling (1959)A genetic algorithm approach to a general category project scheduling problem (1999)A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling (2001)A competitive genetic algorithm for resource-constrained project scheduling (1998)Resource-constrained project scheduling: A survey of recent developments (1998)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)A survey on the resource-constrained project scheduling problem (1995)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation (1998)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)A Constraint-Based Method for Project Scheduling with Time Windows (2002)Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (1984)Resource-constrained project scheduling by simulated annealing (1996)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)
this work references cited by second hop

References

  • 1992A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem606 cited
  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1987Project scheduling with resource constraints: A branch and bound approach377 cited
  • 1988Scheduling project networks with resource constraints and time windows375 cited
  • 1984A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem341 cited
  • 1978Multiple Resource–Constrained Scheduling Using Branch and Bound250 cited
  • 1978An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems209 cited
  • 1989HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS195 cited
  • 1989AN ALGORITHM FOR A GENERAL CLASS OF PRECEDENCE AND RESOURCE CONSTRAINED SCHEDULING PROBLEMS163 cited
  • 1992The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs)156 cited
  • 1989Advances in project scheduling99 cited
  • 1975Project Network Summary Measures Constrained- Resource Scheduling87 cited

Cited by

  • 1998An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations37 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work