Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives
13 references·2 citing·36 second hop
Analysing the novated design and construct contract from the client's, design team's and contractor's perspectives (2008)Analysing the novated design and construc…Causes and effects of delays in Malaysian construction industry (2007)Causes and effects of delays …Factors affecting cost performance: evidence from Indian construction projects (2005)Factors affecting cost perfor…Concessionaire’s Financial Capability in Developing Build-Operate-Transfer Type Infrastructure Projects (2005)Concessionaire’s Financial Ca…Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression (2003)Predicting Accuracy of Early …Making Sense of Factor Analysis: The Use of Factor Analysis for Instrument Development in Health Care Research (2003)Making Sense of Factor Analys…Making Sense of Factor Analysis (2003)Making Sense of Factor Analys…Contractors’ risks in Design, Novate and Construct contracts (2002)Contractors’ risks in Design,…Model for Public Sector Design-Build Project Selection (1998)Model for Public Sector Desig…A comparative study of causes of time overruns in Hong Kong construction projects (1997)A comparative study of causes…Design and build: a survey of architects' views (1995)Design and build: a survey of…Design and build: a survey of construction contractors’ views (1994)Design and build: a survey of…Design-Build Explained (1991)Design-Build ExplainedWhich procurement system? Towards a universal procurement selection technique (1988)Which procurement system? Tow…Assessment of risk factors on construction projects in gondar city, Ethiopia (2022)Assessment of risk factors on…Risk Identification in the Chilean Tunneling Industry (2018)Risk Identification in the Ch…The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects (1985)Factors influencing U.K. construction clients' choice of contractor (1994)Factors affecting the quality of building projects in Hong Kong (2000)Application of Delphi method in selection of procurement systems for construction projects (2001)Measurement in the Social Sciences (1981)Capital structure optimization for build–operate–transfer (BOT) projects using a stochastic and multi-objective approach (2009)Assessment of success factors for joint venture construction projects in Nigeria (2012)Empirical Analysis of Traditional Contracting and Relationship Agreements for Procuring Partners in Construction Projects (2012)The essentials of factor analysis (1970)Critical Success Factors for Different Project Objectives (1999)FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP (2009)Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects (2015)Questionnaire Design and Attitude Measurement. (1968)Project Characteristics for Successful Public-Sector Design-Build (1997)Predicting Performance of Design-Build and Design-Bid-Build Projects (2004)Structural Equation Model of Trust and Partnering Success (2005)Measuring complexity for building projects: a Delphi study (2012)Research methods for business: A skill building approach (1993)Causes of delay in large construction projects (2006)Delays in construction projects: The case of Jordan (2007)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Construction project procurement routes: an in‐depth critique (2009)Developing a Fuzzy Multicriteria Decision-Making Model for Selecting Design-Build Operational Variations (2011)Constructability: Outline of Past, Present, and Future Research (2017)Criteria of project success: an exploratory re-examination (1999)Factors Affecting the Success of a Construction Project (2004)Analysing factors affecting delays in Indian construction projects (2011)Predicting Construction Cost Using Multiple Regression Techniques (2006)Predicting construction cost overruns using text mining, numerical data and ensemble classifiers (2014)Cost estimation and prediction in construction projects: a systematic review on machine learning techniques (2020)Developing questionnaires for educational research: AMEE Guide No. 87 (2014)Exploratory Factor Analysis: A Guide to Best Practice (2018)Practical Considerations for Using Exploratory Factor Analysis in Educational Research (2020)Handbook on Constructing Composite Indicators (2005)Handbook on Constructing Composite Indicators: Methodology and User Guide (2008)
this work references cited by second hop

References

  • 2003Making Sense of Factor Analysis2,167 cited
  • 2003Making Sense of Factor Analysis: The Use of Factor Analysis for Instrument Development in Health Care Research1,692 cited
  • 2007Causes and effects of delays in Malaysian construction industry1,428 cited
  • 1997A comparative study of causes of time overruns in Hong Kong construction projects831 cited
  • 2005Factors affecting cost performance: evidence from Indian construction projects506 cited
  • 2003Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression291 cited
  • 1998Model for Public Sector Design-Build Project Selection223 cited
  • 1988Which procurement system? Towards a universal procurement selection technique143 cited
  • 1994Design and build: a survey of construction contractors’ views100 cited
  • 2005Concessionaire’s Financial Capability in Developing Build-Operate-Transfer Type Infrastructure Projects69 cited
  • 1991Design-Build Explained51 cited
  • 1995Design and build: a survey of architects' views44 cited
  • 2002Contractors’ risks in Design, Novate and Construct contracts40 cited

Cited by

  • 2018Risk Identification in the Chilean Tunneling Industry29 cited
  • 2022

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Assessment of risk factors on construction projects in gondar city, Ethiopia
29 cited