SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Comparison of (s,S) and (s,nQ) inventory control rules with respect to planning stability
9 references·5 citing·34 second hop
Comparison of (s,S) and (s,nQ) inventory control rules with respect to planning stability (2001)Comparison of (s,S) and (s,nQ) inventory …Planning stability under (s,S) inventory control rules (1998)Planning stability under (s,S…Nervousness in inventory management: Comparison of basic control rules (1997)Nervousness in inventory mana…Nervousness in inventory control: Analytical results (1994)Nervousness in inventory cont…Optimal positioning of safety stocks in MRP (1993)Optimal positioning of safety…Manufacturing Planning and Control Systems. (1990)Manufacturing Planning and Co…Interaction between frequency of rescheduling and the role of safety stock in material requirements planning systems (1987)Interaction between frequency…A Comparison of Strategies to Dampen Nervousness in MRP Systems (1986)A Comparison of Strategies to…Manufacturing Planning and Control Systems (1984)Manufacturing Planning and Co…Analysis of Inventory Systems. (1964)Analysis of Inventory Systems.The joint stochastic lot sizing and pricing problem (2021)The joint stochastic lot sizi…Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs (2019)Heuristics for the stochastic…An asymptotic approach for a semi‐Markovian inventory model of type (s, S) (2012)An asymptotic approach for a …An investigation of setup instability in non-stationary stochastic inventory systems (2010)An investigation of setup ins…Airline catering service operation, schedule nervousness and collective efficacy on performance: Hong Kong evidence (2010)Airline catering service oper…Optimal Policies for a Multi-Echelon Inventory Problem (1960)Production and inventory management (1983)POWER APPROXIMATIONS FOR A TWO‐ECHELON INVENTORY SYSTEM USING SERVICE LEVELS (1995)Optimal Policies for a Multi-Echelon Inventory Problem (2004)Dynamic planned safety stocks in supply networks (2009)Models for multi-plant coordination (1993)Uncertainty under MRP-planned manufacture: Review and categorization (2002)Dynamic Version of the Economic Lot Size Model (2004)Supply planning under uncertainties in MRP environments: A state of the art (2007)Studies in Mathematical Theory of Inventory and Production (1959)Static-dynamic uncertainty strategy for a single-item stochastic inventory control problem (2011)MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY (1976)The Effect of Commonality on Safety Stock in a Simple Inventory Model (1986)A Model for Continuous-Review Pull Policies in Serial Inventory Systems (1992)Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain (2008)Strategic Safety Stocks in Supply Chains with Evolving Forecasts (2009)Stochastic Processes in Queueing Theory (1976)Finding Optimal (s, S) Policies Is About As Simple As Evaluating a Single Policy (1991)Optimality of ( s , S ) Policies in Inventory Models with Markovian Demand (1997)CONWIP: a pull alternative to kanban (1990)Models for production planning under uncertainty: A review (2006)The evolution of the intellectual structure of operations management—1980–2006: A citation/co‐citation analysis (2008)A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR (1986)Lot Sizing with Random Yields: A Review (1995)The single-period (news-vendor) problem: literature review and suggestions for future research (1999)How to release orders in order to minimise system inventory and system nervousness? (2002)Constraint programming for computing non-stationary (R,S) inventory policies (2007)Multi-facilities tactical planning robustness with experimental design (2008)Modelling and computing (Rn,Sn) policies for inventory systems with non-stationary stochastic demand (2005)Planning nervousness in a demand supply network: an empirical study (2006)Piecewise linear approximations for the static–dynamic uncertainty strategy in stochastic lot-sizing (2014)Production control in engineer-to-order firms (1993)What academic research tells us about service (2006)Lean Production and information technology: Connection or contradiction? (2009)
this work references cited by second hop

References

  • 1964Analysis of Inventory Systems.2,345 cited
  • 1984Manufacturing Planning and Control Systems1,029 cited
  • 1990Manufacturing Planning and Control Systems.430 cited
  • 1986A Comparison of Strategies to Dampen Nervousness in MRP Systems201 cited
  • 1997Nervousness in inventory management: Comparison of basic control rules78 cited
  • 1987Interaction between frequency of rescheduling and the role of safety stock in material requirements planning systems62 cited
  • 1993Optimal positioning of safety stocks in MRP38 cited
  • 1994Nervousness in inventory control: Analytical results33 cited
  • 1998Planning stability under (s,S) inventory control rules33 cited

Cited by

  • 2012An asymptotic approach for a semi‐Markovian inventory model of type (s, S)24 cited
  • 2019Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs22 cited
  • 2021The joint stochastic lot sizing and pricing problem18 cited
  • 2010An investigation of setup instability in non-stationary stochastic inventory systems16 cited
  • 2010Airline catering service operation, schedule nervousness and collective efficacy on performance: Hong Kong evidence15 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work