Object-Oriented Model for Repetitive Construction Scheduling
13 references·2 citing·23 second hop
Object-Oriented Model for Repetitive Construction Scheduling (2001)Object-Oriented Model for Repetitive Cons…Resource-driven scheduling of repetitive activities (1998)Resource-driven scheduling of…Estimating weather impact on the duration of construction activities (1997)Estimating weather impact on …Time Is Money: Innovative Contracting Methods in Highway Construction (1995)Time Is Money: Innovative Con…A+B Bidding Method—Hidden Success Story for Highway Construction (1995)A+B Bidding Method—Hidden Suc…Scheduling of Repetitive Projects with Cost Optimization (1993)Scheduling of Repetitive Proj…New Generation of Planning Structures (1993)New Generation of Planning St…RPM: Repetitive Project Modeling (1990)RPM: Repetitive Project Model…Extensions to Linear Scheduling Optimization (1988)Extensions to Linear Scheduli…Application of Linear Scheduling (1986)Application of Linear Schedul…Siren: A Repetitive Construction Simulation Model (1985)Siren: A Repetitive Construct…Simulation of Repetitive-Unit Construction (1980)Simulation of Repetitive-Unit…Construction Planning—Beyond the Critical Path (1980)Construction Planning—Beyond …Construction Planning for Linear Projects (1980)Construction Planning for Lin…Multiobjective Optimization Model for Planning Repetitive Construction Projects (2021)Multiobjective Optimization M…Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building (2011)Simulation-Based Schedule Est…Multiparameter Bidding System—Innovation in Contract Administration (1992)Incentive/Disincentive Contracts: Perceptions of Owners and Contractors (1998)Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects (2006)The use of time and cost utility for construction contract award under European Union Legislation (2006)Linear Scheduling Method for Highway Construction (1981)CPM/LOB: New Methodology to Integrate CPM and Line of Balance (1994)Work Continuity Constraints in Project Scheduling (2005)Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)Line‐of‐Balance Scheduling in Pavement Construction (1986)Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach (2008)Project Management with Dynamic Scheduling (2012)Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)A genetic algorithm-based method for scheduling repetitive construction projects (2009)A Comparison of Buyer-Determined and Price-Based Multiattribute Mechanisms (2007)Court Efficiency and Procurement Performance (2017)Causes of schedule delays in construction projects in Algeria (2018)Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Optimizing Resource Utilization for Repetitive Construction Projects (2001)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Optimal Repetitive Scheduling Model with Shareable Resource Constraint (2001)Optimization model for resource assignment problems of linear construction projects (2006)Genetic algorithm-based multi-objective model for scheduling of linear construction projects (2008)
this work references cited by second hop

References

  • 1990RPM: Repetitive Project Modeling176 cited
  • 1995Time Is Money: Innovative Contracting Methods in Highway Construction159 cited
  • 1980Construction Planning for Linear Projects136 cited
  • 1986Application of Linear Scheduling128 cited
  • 1980Construction Planning—Beyond the Critical Path123 cited
  • 1998Resource-driven scheduling of repetitive activities114 cited
  • 1993New Generation of Planning Structures113 cited
  • 1993Scheduling of Repetitive Projects with Cost Optimization112 cited
  • 1988Extensions to Linear Scheduling Optimization101 cited
  • 1995A+B Bidding Method—Hidden Success Story for Highway Construction85 cited
  • 1997Estimating weather impact on the duration of construction activities75 cited
  • 1980Simulation of Repetitive-Unit Construction73 cited
  • 1985Siren: A Repetitive Construction Simulation Model66 cited

Cited by

  • 2011Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building37 cited
  • 2021Multiobjective Optimization Model for Planning Repetitive Construction Projects32 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work