How practitioners set share fractions in target cost contracts
5 references·16 citing·52 second hop
How practitioners set share fractions in target cost contracts (2002)How practitioners set share fractions in …On the allocation of risk in construction projects (1991)On the allocation of risk in …RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS. (1985)RISK AND ITS MANAGEMENT IN CO…Optimal incentive contracts with multiple agents (1984)Optimal incentive contracts w…The Investment Banking Contract For New Issues Under Asymmetric Information: Delegation And The Incentive Problem (1980)The Investment Banking Contra…Efficient Incentive Contracts (1980)Efficient Incentive ContractsRisk Assessment Model for Optimal Gain–Pain Share Ratio in Target Cost Contract for Construction Projects (2021)Risk Assessment Model for Opt…Incentive contract design for projects: The owner׳s perspective (2015)Incentive contract design for…DETERMINANTS OF TRANSACTION COSTS IN CONSTRUCTION PROJECTS (2015)DETERMINANTS OF TRANSACTION C…Risk/Reward Compensation Model for Integrated Project Delivery (2014)Risk/Reward Compensation Mode…Collaborative incentive contracts: stimulating competitive behaviour without competition (2014)Collaborative incentive contr…PROS AND CONS FOR THE IMPLEMENTATION OF TARGET COSTING METHOD IN ROMANIAN ECONOMIC ENTITIES (2013)PROS AND CONS FOR THE IMPLEME…Principal-Agent Model of Risk Allocation in Construction Contracts and Its Critique (2013)Principal-Agent Model of Risk…Transaction-related issues and construction project performance (2012)Transaction-related issues an…Is incentivisation significant in ensuring successful partnered projects? (2012)Is incentivisation significan…Collaboration in public construction—contractual incentives, partnering schemes and trust (2012)Collaboration in public const…Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction (2010)Empirical Study of the Risks …Conceptualizing a two‐stage target‐cost arrangement for competitive cooperation (2010)Conceptualizing a two‐stage t…An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction (2010)An empirical survey of the mo…Achieving better performance through target cost contracts (2010)Achieving better performance …The selection of sharing ratios in target cost contracts (2008)The selection of sharing rati…Incentives in the Chinese Construction Industry (2008)Incentives in the Chinese Con…The Weapons Acquisition Process: An Economic Analysis (1963)The Economic Theory of Agency: The Principal's Problem. (1973)Risk Sharing and Incentives in the Principal and Agent Relationship (1979)Bidding for Contracts (1986)A model of duopoly and meeting or beating competition (1987)Compensation mechanism for urban water environment treatment PPP project in China (2018)The Market for "Lemons": Quality Uncertainty and the Market Mechanism (1970)The economics of moral hazard: comment (1982)Contractual risk and liability sharing in hydropower construction (1999)Cost plus incentive fee contracting — experiences and structuring (2000)Risk allocation in public-private partnership water supply projects in Ghana (2015)Case Study Research: Design and Methods (1984)Agency Theory: An Assessment and Review (1989)Case Study Research (2004)Optimal Incentive Contract with Risk-Neutral Contractor (2012)Promoting cooperation in construction projects: an integrated approach of contractual incentive and trust (2015)Moral Hazard and Observability (1979)Moral Hazard in Teams (1982)An Analysis of the Principal-Agent Problem (1983)Subgame Perfect Implementation (1988)Chapter 2 The theory of the firm (1989)Chapter 27 Recent Developments in the Theory of Regulation (2007)The Costs and Benefits of Ownership: A Theory of Vertical and Lateral Integration (1986)The Economic Institutions of Capitalism (1987)Impacts of uncertain project duration and asymmetric risk sensitivity information in project management (2015)Transitional Public–Private Partnership Model in China: Contracting with Little Recourse to Contracts (2016)Project Appraisal and Planning for Developing Countries (1976)A classified bibliography of recent research relating to project risk management (1995)Risk Management in International Construction Joint Ventures (1999)Knowledge-Based Approach to Construction Project Risk Management (2001)Risk analysis and management in construction (1997)The balanced scorecard: Translating strategy into action (1997)Trust in project relationships—inside the black box (2003)Risk management of hydropower development in China (2013)Enhancing Design Management by Partnering in Delivery of International EPC Projects: Evidence from Chinese Construction Companies (2015)Factors governing construction project delivery selection: A content analysis (2015)Cronbach's Alpha: A Tool for Assessing the Reliability of Scales (1999)WITHDRAWN - Mixed Methods Sampling (2007)Designing a Qualitative Study (2009)Claims and Project Performance between Traditional and Alternative Project Delivery Methods (2018)Double Moral Hazard and Risk-Sharing in Construction Projects (2019)The Theory of Syndicates (1968)Price performance of common stock new issues (1975)Regulation and information in a continuing relationship (1984)Litigation Risk, Intermediation, and the Underpricing of Initial Public Offerings (1992)Discounting and underpricing in seasoned equity offers (2003)The Nature of the Firm (1937)The economic institutions of capitalism firms, markets, relational contracting (1985)The balanced scorecard : measures that drive performance (1992)PROPOSING A NEURAL NETWORK MODEL TO PREDICT TIME AND COST CLAIMS IN CONSTRUCTION PROJECTS (2016)Factors affecting transaction costs and collaboration in projects (2019)Identifying Critical Dispute Causes in the Construction Industry: A Cross-Regional Comparative Study between China and the UK (2022)
this work references cited by second hop

References

  • 1984Optimal incentive contracts with multiple agents317 cited
  • 1980The Investment Banking Contract For New Issues Under Asymmetric Information: Delegation And The Incentive Problem280 cited
  • 1985RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS.223 cited
  • 1980Efficient Incentive Contracts118 cited
  • 1991On the allocation of risk in construction projects111 cited

Cited by

  • 2008Incentives in the Chinese Construction Industry70 cited
  • 2008The selection of sharing ratios in target cost contracts67 cited
  • 2013Principal-Agent Model of Risk Allocation in Construction Contracts and Its Critique62 cited
  • 2015DETERMINANTS OF TRANSACTION COSTS IN CONSTRUCTION PROJECTS59 cited
  • 2010An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction55 cited
  • 2012Transaction-related issues and construction project performance50 cited
  • 2012Collaboration in public construction—contractual incentives, partnering schemes and trust50 cited
  • 2021Risk Assessment Model for Optimal Gain–Pain Share Ratio in Target Cost Contract for Construction Projects46 cited
  • 2010Conceptualizing a two‐stage target‐cost arrangement for competitive cooperation42 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2012Is incentivisation significant in ensuring successful partnered projects?39 cited
  • 2014Collaborative incentive contracts: stimulating competitive behaviour without competition37 cited
  • 2010Achieving better performance through target cost contracts36 cited
  • 2014Risk/Reward Compensation Model for Integrated Project Delivery34 cited
  • 2010Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction34 cited
  • 2015Incentive contract design for projects: The owner׳s perspective32 cited
  • 2013PROS AND CONS FOR THE IMPLEMENTATION OF TARGET COSTING METHOD IN ROMANIAN ECONOMIC ENTITIES16 cited