A new heuristic for the multi-mode resource investment problem
14 references·2 citing·40 second hop
A new heuristic for the multi-mode resource investment problem (2004)A new heuristic for the multi-mode resour…Resource levelling for projects with schedule-dependent time windows (1999)Resource levelling for projec…Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project …Efficient priority rules for the resource‐constrained project scheduling problem (1996)Efficient priority rules for …Project Scheduling under Resource Constraints (1995)Project Scheduling under Reso…Minimizing Resource Availability Costs in Time-Limited Project Networks (1995)Minimizing Resource Availabil…Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case (1994)Resource-Constrained Project …Resource-Constrained Project Scheduling (1994)Resource-Constrained Project …Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics (1993)Resource-constrained multi-pr…Project Scheduling Problems: A Survey (1993)Project Scheduling Problems: …Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Some efficient multi-heuristi…Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time (1984)Minimizing Costs of Resource …Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Resource-Constrained Project …Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)Multi-Project Scheduling: Cat…Multiobjective network scheduling with efficient use of renewable and nonrenewable resources (1981)Multiobjective network schedu…An interval-stochastic programming based approach for a fully uncertain multi-objective and multi-mode resource investment project scheduling problem with an application to ERP project implementation (2020)An interval-stochastic progra…Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems (2017)Mixed-integer linear programm…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)PSPLIB - A project scheduling problem library (1997)Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)An integrated survey of deterministic project scheduling (2001)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Problems and methods with multiple objective functions (1971)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems (1978)Hierarchical models for multi-project planning and scheduling (1993)NONPREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING (1993)Fuzzy project scheduling system for software development (1994)Activity networks: Project planning and control by network models (1977)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A survey on the resource-constrained project scheduling problem (1995)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Production and inventory management (1983)Resource-constrained project scheduling: A critical activity reordering heuristic (2003)Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (2011)A review of methods and algorithms for optimizing construction scheduling (2013)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty (2006)Operational Research: methods and applications (2023)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)A Robust Genetic Algorithm for Resource Allocation in Project Scheduling (2001)Insertion techniques for static and dynamic resource-constrained project scheduling (2003)Project management with CPM and PERT (1965)Intransitive Indifference in Preference Theory: A Survey (1970)Stochastic scheduling problems I — General strategies (1984)Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (2000)Solving Project Scheduling Problems by Minimum Cut Computations (2003)New Benchmark Results for the Resource-Constrained Project Scheduling Problem (1997)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)Project Scheduling—Theory and Practice (2005)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)A genetic algorithm for resource-constrained scheduling (1996)The multi-mode resource-constrained project scheduling problem with generalized precedence relations (1999)
this work references cited by second hop

References

  • 1998Resource-constrained project scheduling: A survey of recent developments562 cited
  • 1982Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case456 cited
  • 1996Efficient priority rules for the resource‐constrained project scheduling problem301 cited
  • 1982Multi-Project Scheduling: Categorization of Heuristic Rules Performance289 cited
  • 1990Some efficient multi-heuristic procedures for resource-constrained project scheduling261 cited
  • 1984Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time204 cited
  • 1995Project Scheduling under Resource Constraints168 cited
  • 1993Project Scheduling Problems: A Survey163 cited
  • 1981Multiobjective network scheduling with efficient use of renewable and nonrenewable resources144 cited
  • 1995Minimizing Resource Availability Costs in Time-Limited Project Networks136 cited
  • 1993Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics126 cited
  • 1999Resource levelling for projects with schedule-dependent time windows110 cited
  • 1994Resource-Constrained Project Scheduling: Exact Methods for the Multi-Mode Case97 cited
  • 1994Resource-Constrained Project Scheduling63 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Cited by

  • 2017Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems43 cited
  • 2020An interval-stochastic programming based approach for a fully uncertain multi-objective and multi-mode resource investment project scheduling problem with an application to ERP project implementation41 cited