SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Planning stability under (s,S) inventory control rules
8 references·6 citing·39 second hop
Planning stability under (s,S) inventory control rules (1998)Planning stability under (s,S) inventory …Nervousness in inventory management: Comparison of basic control rules (1997)Nervousness in inventory mana…Nervousness in inventory control: Analytical results (1994)Nervousness in inventory cont…Optimal positioning of safety stocks in MRP (1993)Optimal positioning of safety…Manufacturing Planning and Control Systems. (1990)Manufacturing Planning and Co…Interaction between frequency of rescheduling and the role of safety stock in material requirements planning systems (1987)Interaction between frequency…A Comparison of Strategies to Dampen Nervousness in MRP Systems (1986)A Comparison of Strategies to…Manufacturing Planning and Control Systems (1984)Manufacturing Planning and Co…Analysis of Inventory Systems. (1964)Analysis of Inventory Systems.An investigation of setup instability in non-stationary stochastic inventory systems (2010)An investigation of setup ins…Multi-facilities tactical planning robustness with experimental design (2008)Multi-facilities tactical pla…Constraint programming for computing non-stationary (R,S) inventory policies (2007)Constraint programming for co…How to release orders in order to minimise system inventory and system nervousness? (2002)How to release orders in orde…Planning stability in a product recovery system (2001)Planning stability in a produ…Comparison of (s,S) and (s,nQ) inventory control rules with respect to planning stability (2001)Comparison of (s,S) and (s,nQ…Robust Optimization of Large-Scale Systems (1995)Quantitative Models for Supply Chain Management (1999)Supply Chain Management - Pathways for Research and Practice (2011)A meta-model based simulation optimization using hybrid simulation-analytical modeling to increase the productivity in automotive industry (2015)A robust design for a Colombian dairy cooperative's milk storage and refrigeration logistics system using binary programming (2016)Optimal Policies for a Multi-Echelon Inventory Problem (1960)Production and inventory management (1983)POWER APPROXIMATIONS FOR A TWO‐ECHELON INVENTORY SYSTEM USING SERVICE LEVELS (1995)Optimal Policies for a Multi-Echelon Inventory Problem (2004)Dynamic planned safety stocks in supply networks (2009)Models for multi-plant coordination (1993)Uncertainty under MRP-planned manufacture: Review and categorization (2002)Dynamic Version of the Economic Lot Size Model (2004)Supply planning under uncertainties in MRP environments: A state of the art (2007)Studies in Mathematical Theory of Inventory and Production (1959)Static-dynamic uncertainty strategy for a single-item stochastic inventory control problem (2011)MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY (1976)The Effect of Commonality on Safety Stock in a Simple Inventory Model (1986)A Model for Continuous-Review Pull Policies in Serial Inventory Systems (1992)Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain (2008)Strategic Safety Stocks in Supply Chains with Evolving Forecasts (2009)MATHEMATICAL METHODS IN THE SOCIAL SCIENCES, 1959 (1960)Inventory management and production planning and scheduling (1999)The Optimality of (S,s) Policies in the Dynamic Inventory Problem (2005)Heuristic-based neural networks for stochastic dynamic lot sizing problem (2012)An Extended Mixed-Integer Programming Formulation and Dynamic Cut Generation Approach for the Stochastic Lot-Sizing Problem (2018)Heuristics for a periodic-review policy in a two-echelon inventory problem with seasonal demand (2019)CONWIP: a pull alternative to kanban (1990)Models for production planning under uncertainty: A review (2006)The evolution of the intellectual structure of operations management—1980–2006: A citation/co‐citation analysis (2008)A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR (1986)Lot Sizing with Random Yields: A Review (1995)The single-period (news-vendor) problem: literature review and suggestions for future research (1999)Modelling and computing (Rn,Sn) policies for inventory systems with non-stationary stochastic demand (2005)Planning nervousness in a demand supply network: an empirical study (2006)Piecewise linear approximations for the static–dynamic uncertainty strategy in stochastic lot-sizing (2014)Production control in engineer-to-order firms (1993)What academic research tells us about service (2006)Lean Production and information technology: Connection or contradiction? (2009)
this work references cited by second hop

References

  • 1964Analysis of Inventory Systems.2,345 cited
  • 1984Manufacturing Planning and Control Systems1,029 cited
  • 1990Manufacturing Planning and Control Systems.430 cited
  • 1986A Comparison of Strategies to Dampen Nervousness in MRP Systems201 cited
  • 1997Nervousness in inventory management: Comparison of basic control rules78 cited
  • 1987Interaction between frequency of rescheduling and the role of safety stock in material requirements planning systems62 cited
  • 1993Optimal positioning of safety stocks in MRP38 cited
  • 1994Nervousness in inventory control: Analytical results33 cited

Cited by

  • 2007Constraint programming for computing non-stationary (R,S) inventory policies32 cited
  • 2008Multi-facilities tactical planning robustness with experimental design27 cited
  • 2001Comparison of (s,S) and (s,nQ) inventory control rules with respect to planning stability25 cited
  • 2002How to release orders in order to minimise system inventory and system nervousness?21 cited
  • 2001Planning stability in a product recovery system18 cited
  • 2010An investigation of setup instability in non-stationary stochastic inventory systems16 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work