No open-access location is known for this record yet.
No open-access location is known for this record yet.
This article analyzes the World Bank's experience with project evaluation for a sample of 1,015 projects by comparing estimated rates of return at appraisal with reestimated rates of return when construction works are completed, usually 5 to 10 years after appraisal. The analysis highlights the high degree of uncertainty in project analysis. A wide range of variables has been introduced to explain the observed divergence in appraisal and reestimated rates of return, but only a relatively small part of the divergence can be explained, even with the benefit of hindsight. Project analysis thus has to cope with a large degree of uncertainty, which the traditional methods of project evaluation and selection have not been able to reduce.
Loading…
Stored only when both papers are in the corpus — 112 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.