An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment
9 references·3 citing·36 second hop
An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment (1997)An evaluation of due date, resource alloc…Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics (1993)Resource-constrained multi-pr…Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach (1993)Early-tardy cost trade-offs i…A comparison of resource allocation and activity scheduling rules in a dynamic multi‐project environment (1993)A comparison of resource allo…Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis (1988)Evaluating Project Scheduling…Multi-Project Scheduling: Analysis of Project Performance (1985)Multi-Project Scheduling: Ana…Simulation Modeling and Analysis. (1983)Simulation Modeling and Analy…Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)Multi-Project Scheduling: Cat…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Multiproject Scheduling with …A Heuristic Model for Scheduling Large Projects with Limited Resources (1967)A Heuristic Model for Schedul…A new extension of the RCPSP in a multi-site context: Mathematical model and metaheuristics (2017)A new extension of the RCPSP …Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times (2015)Resource Constrained Multi-Pr…Dynamic order acceptance and capacity planning on a single bottleneck resource (2007)Dynamic order acceptance and …A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Analysis of the characteristics of projects in diverse industries (1998)A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (2008)Simulation-Based Multiagent Approach for Scheduling Modular Construction (2012)Cash Flows in Networks (1970)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)A comparison of stochastic scheduling rules for maximizing project net present value (1995)Using discounted cash flow heuristics to improve project net present valve (1996)Maximizing the Net Present Value of a Project Under Resource Constraints Using a Lagrangian Relaxation Based Heuristic with Tight Upper Bounds (2001)Design and Analysis of Industrial Experiments. (1955)NONPREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING (1993)Investment under Uncertainty (1994)Investment Under Uncertainty. (1994)Project management : a systems approach to planning, scheduling, and controlling (1995)Revenue management for operations with urgent orders (2014)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Managing and modelling general resource transfers in (multi-)project scheduling (2008)On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem (2017)Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling (2020)Application of a Technique for Research and Development Program Evaluation (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)A Heuristic Program for Locating Warehouses (1976)Project scheduling: The effects of problem structure on heuristic performance (1976)Scheduling of Project Networks by Job Assignment (1991)Heuristics for scheduling projects with resource restrictions and several resource-duration modes (1993)Multi-project scheduling with two-stage decomposition (2014)Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches (2021)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)Project Scheduling—Theory and Practice (2005)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Testing ecological models: the meaning of validation (1996)Developing Theory Through Simulation Methods (2007)Verification and validation of simulation models (2012)
this work references cited by second hop

References

  • 1983Simulation Modeling and Analysis.8,697 cited
  • 1969Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach773 cited
  • 1982Multi-Project Scheduling: Categorization of Heuristic Rules Performance289 cited
  • 1967A Heuristic Model for Scheduling Large Projects with Limited Resources164 cited
  • 1985Multi-Project Scheduling: Analysis of Project Performance141 cited
  • 1993Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics126 cited
  • 1988Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis97 cited
  • 1993A comparison of resource allocation and activity scheduling rules in a dynamic multi‐project environment55 cited
  • 1993Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach53 cited

Cited by

  • 2007Dynamic order acceptance and capacity planning on a single bottleneck resource44 cited
  • 2017A new extension of the RCPSP in a multi-site context: Mathematical model and metaheuristics43 cited
  • 2015Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times38 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work