GA optimization model for repetitive projects with soft logic
16 references·9 citing·31 second hop
GA optimization model for repetitive projects with soft logic (2011)GA optimization model for repetitive proj…Fuzzy-based MOGA approach to stochastic time–cost trade-off problem (2009)Fuzzy-based MOGA approach to …A genetic algorithm-based method for scheduling repetitive construction projects (2009)A genetic algorithm-based met…Applying an Ant Colony Optimization Algorithm-Based Multiobjective Approach for Time–Cost Trade-Off (2008)Applying an Ant Colony Optimi…A two-phase GA model for resource-constrained project scheduling (2008)A two-phase GA model for reso…Evolutionary resource scheduler for linear projects (2007)Evolutionary resource schedul…Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Use of Genetic Algorithms in …Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization (2004)Applying Pareto Ranking and N…Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Applying a Genetic Algorithm-…Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Cost Optimization in Projects…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…Construction Resource Scheduling with Genetic Algorithms (1996)Construction Resource Schedul…Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method (1995)Construction Time-Cost Trade-…Scheduling of Repetitive Projects with Cost Optimization (1993)Scheduling of Repetitive Proj…Schedule compression using the direct stiffness method (1993)Schedule compression using th…RPM: Repetitive Project Modeling (1990)RPM: Repetitive Project Model…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm (2021)Tradeoff time cost quality in…Schedule optimization for scattered repetitive projects (2021)Schedule optimization for sca…A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic (2019)A constraint programming appr…Space-Time Repetitive Project Scheduling Considering Location and Congestion (2018)Space-Time Repetitive Project…Minimizing duration and crew work interruptions of repetitive construction projects (2018)Minimizing duration and crew …Survey of quantitative methods in construction (2017)Survey of quantitative method…Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Opposition multiple objective…Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic (2016)Genetic Algorithm–Based Metho…Incorporating Multiskilling and Learning in the Optimization of Crew Composition (2015)Incorporating Multiskilling a…A Simple CPM Time-Cost Tradeoff Algorithm (1971)Stochastic Construction Time-Cost Trade-Off Analysis (2000)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)A review of methods and algorithms for optimizing construction scheduling (2013)Project scheduling with resource constraints: A branch and bound approach (1987)Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Metaheuristics for project and construction management – A state-of-the-art review (2011)Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Scheduling Projects with Repeating Activities (1998)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Optimizing linear project scheduling with multi-skilled crews (2012)Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems (2017)Project management in construction (2007)A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project (2013)A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project (2020)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Work Continuity Constraints in Project Scheduling (2005)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)Fuzzy sets (1965)Fuzzy sets (1996)Extraction of decision alternatives in construction management projects: Application and adaptation of NSGA-II and MOPSO (2011)Schedule Optimization Using Genetic Algorithms (1991)GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)Application of a Technique for Research and Development Program Evaluation (1959)Critical-path planning and scheduling (1959)An integrated survey of deterministic project scheduling (2001)Optimizing Resource Utilization for Repetitive Construction Projects (2001)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)
this work references cited by second hop

References

  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 2004Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization266 cited
  • 1996Construction Resource Scheduling with Genetic Algorithms241 cited
  • 2004Use of Genetic Algorithms in Resource Scheduling of Construction Projects184 cited
  • 1990RPM: Repetitive Project Modeling176 cited
  • 1995Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method171 cited
  • 2001Cost Optimization in Projects with Repetitive Nonserial Activities147 cited
  • 2004Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization141 cited
  • 2009A genetic algorithm-based method for scheduling repetitive construction projects129 cited
  • 1993Schedule compression using the direct stiffness method125 cited
  • 2008A two-phase GA model for resource-constrained project scheduling124 cited
  • 1993Scheduling of Repetitive Projects with Cost Optimization112 cited
  • 2008Applying an Ant Colony Optimization Algorithm-Based Multiobjective Approach for Time–Cost Trade-Off110 cited
  • 2009

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Fuzzy-based MOGA approach to stochastic time–cost trade-off problem
106 cited
  • 2007Evolutionary resource scheduler for linear projects91 cited
  • Cited by

    • 2017Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects69 cited
    • 2016Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic64 cited
    • 2021Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm54 cited
    • 2015Incorporating Multiskilling and Learning in the Optimization of Crew Composition52 cited
    • 2019A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic51 cited
    • 2018Space-Time Repetitive Project Scheduling Considering Location and Congestion50 cited
    • 2018Minimizing duration and crew work interruptions of repetitive construction projects40 cited
    • 2021Schedule optimization for scattered repetitive projects35 cited
    • 2017Survey of quantitative methods in construction34 cited