SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
SCaRC: Space-Constrained Resource-Constrained Scheduling System
2 references·3 citing·16 second hop
SCaRC: Space-Constrained Resource-Constrained Scheduling System (1997)SCaRC: Space-Constrained Resource-Constra…Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings (1994)Modeling Work Space to Schedu…HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects (1994)HVLS: Horizontal and Vertical…Schedule optimization for scattered repetitive projects (2021)Schedule optimization for sca…Object-Oriented Scheduling for Repetitive Projects with Soft Logics (2005)Object-Oriented Scheduling fo…Proactive Approach for Reducing Non-Value Adding Activities Due to Time-Space Conflicts (1998)Proactive Approach for Reduci…Linear Scheduling Method for Highway Construction (1981)Line‐of‐Balance Scheduling in Pavement Construction (1986)RPM: Repetitive Project Modeling (1990)Scheduling system for high rise building construction (2002)Resource Leveling in Line-of-Balance Scheduling (2013)Multi-objective genetic optimization for scheduling a multi-storey building (2014)Linear Scheduling Model: Development of Controlling Activity Path (1998)Optimizing Resource Utilization for Repetitive Construction Projects (2001)Resource-constrained scheduling for continuous repetitive projects with time-based production units (2009)Minimizing duration and crew work interruptions of repetitive construction projects (2018)Scheduling Projects with Repeating Activities (1998)GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)Construction Planning—Beyond the Critical Path (1980)Interaction between Subcycles: One Key to Improved Methods (1993)Improvement Algorithm for Limited Space Scheduling (2001)Critical Space Analysis (2006)
this work references cited by second hop

References

  • 1994Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings114 cited
  • 1994HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects65 cited

Cited by

  • 2005Object-Oriented Scheduling for Repetitive Projects with Soft Logics42 cited
  • 2021Schedule optimization for scattered repetitive projects35 cited
  • 1998Proactive Approach for Reducing Non-Value Adding Activities Due to Time-Space Conflicts33 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work