A heuristic for network project scheduling with random activity durations depending on the resource allocation
7 references·7 citing·39 second hop
A heuristic for network project scheduling with random activity durations depending on the resource allocation (1998)A heuristic for network project schedulin…Stochastic network project scheduling with non-consumable limited resources (1997)Stochastic network project sc…Resource-constrained project scheduling by simulated annealing (1996)Resource-constrained project …Project Scheduling under Resource Constraints (1995)Project Scheduling under Reso…Project management: engineering, technology, and implementation (1994)Project management: engineeri…A new heuristic solution method in resource-constrained project scheduling (1991)A new heuristic solution meth…Operations research: An introduction (1988)Operations research: An intro…Operations Research -- An Introduction (1980)Operations Research -- An Int…Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project (2015)Evolutionary multi-objective …A Knowledge-Based Evolutionary Multiobjective Approach for Stochastic Extended Resource Investment Project Scheduling Problems (2013)A Knowledge-Based Evolutionar…Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation (2009)Ant colony optimization algor…Multi-objective time–cost trade-off in dynamic PERT networks using an interactive approach (2006)Multi-objective time–cost tra…A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept (2005)A new heuristic for resource-…Activity time–cost tradeoffs under time and cost chance constraints (2003)Activity time–cost tradeoffs …Crashing PERT networks using mathematical programming (2001)Crashing PERT networks using …Portfolio Selection (1952)Robust optimization – A comprehensive survey (2007)Distributionally Robust Optimization Under Moment Uncertainty with Application to Data-Driven Problems (2010)Space-Time Repetitive Project Scheduling Considering Location and Congestion (2018)An interval-stochastic programming based approach for a fully uncertain multi-objective and multi-mode resource investment project scheduling problem with an application to ERP project implementation (2020)Application of a Technique for Research and Development Program Evaluation (1959)Critical chain: the theory of constraints applied to project management (2000)On the merits and pitfalls of critical chain scheduling (2001)Multi-objective optimization model for multi-project scheduling on critical chain (2013)Effective expediting to improve project due date and cost performance through buffer management (2014)Project buffer sizing of a critical chain based on comprehensive resource tightness (2015)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Solving resource-constrained project scheduling problems by a* search (1990)Local search techniques for the generalized resource constrained project scheduling problem (1993)Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling (2003)Journal of Industrial Engineering (2017)Introduction to Operations Research (1968)The New Industrial State (2007)Management Guide to PERT/CPM (1969)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (2009)Resource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations (2009)Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (2015)Activity networks: Project planning and control by network models (1977)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)The multi-mode resource-constrained project scheduling problem with generalized precedence relations (1999)Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (2011)An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case (2017)Managing multi-project environments through constant work-in-process (2002)Project management competence development framework in turbulent business environment (2004)Time-Cost Optimization of Construction Projects with Generalized Activity Constraints (2005)ON HOW TO PRIORITIZE DESIGN REQUIREMENTS DURING THE QFD PLANNING PROCESS (1993)The total cost of logistics in supplier selection, under conditions of multiple sourcing, multiple criteria and capacity constraint (2001)Application of AHP Technique (2009)A fuzzy EOQ model with demand-dependent unit cost under limited storage capacity (1997)A Bayesian approach to a dynamic inventory model under an unknown demand distribution (2002)A genetic algorithm for resource-constrained scheduling (1996)Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (2000)
this work references cited by second hop

References

  • 1980Operations Research -- An Introduction1,560 cited
  • 1988Operations research: An introduction278 cited
  • 1994Project management: engineering, technology, and implementation176 cited
  • 1996Resource-constrained project scheduling by simulated annealing174 cited
  • 1995Project Scheduling under Resource Constraints168 cited
  • 1997Stochastic network project scheduling with non-consumable limited resources133 cited
  • 1991A new heuristic solution method in resource-constrained project scheduling84 cited

Cited by

  • 2005A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept66 cited
  • 2013A Knowledge-Based Evolutionary Multiobjective Approach for Stochastic Extended Resource Investment Project Scheduling Problems61 cited
  • 2003Activity time–cost tradeoffs under time and cost chance constraints53 cited
  • 2001Crashing PERT networks using mathematical programming51 cited
  • 2006Multi-objective time–cost trade-off in dynamic PERT networks using an interactive approach48 cited
  • 2009Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation42 cited
  • 2015Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

40 cited