SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales
16 references·9 citing·43 second hop
Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales (2011)Single-vendor single-buyer inventory mode…An integrated vendor–buyer inventory model with backorder price discount and effective investment to reduce ordering cost (2008)An integrated vendor–buyer in…A genetic algorithm approach to optimize a multi-products EPQ model with discrete delivery orders and constrained space (2007)A genetic algorithm approach …Production and shipment lot sizing in a vendor–buyer supply chain with transportation cost (2006)Production and shipment lot s…Optimal production and shipment models for a single-vendor–single-buyer integrated system (2006)Optimal production and shipme…Coordinating a two-level supply chain with delay in payments and profit sharing (2006)Coordinating a two-level supp…An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation (2006)An integrated production-inve…Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy (2004)Optimal models for a multi-st…Integrated single vendor single buyer model with stochastic demand and variable lead time (2003)Integrated single vendor sing…An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration (2003)An optimal policy for a singl…A JIT lot-splitting model for supply chain management: Enhancing buyer–supplier linkage (2003)A JIT lot-splitting model for…A discrete-time Markov production-inventory model with machine breakdowns (2001)A discrete-time Markov produc…Determination of economic production–shipment policy for a single-vendor–single-buyer system (2000)Determination of economic pro…An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment (2000)An optimal policy for a singl…Production Lot Sizing with Machine Breakdowns (1992)Production Lot Sizing with Ma…A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR (1986)A JOINT ECONOMIC‐LOT‐SIZE MOD…Principles of inventory and materials management (1982)Principles of inventory and m…Economic production quantity models for an imperfect manufacturing system with strict inspection (2024)Economic production quantity …Optimal integrated production-inventory system considering shortages and discrete delivery orders (2021)Optimal integrated production…Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory (2020)Coordination Supply Chain Man…A vendor–buyer inventory model with lot-size and production rate dependent lead time under time value of money (2019)A vendor–buyer inventory mode…A vendor–buyer integrated inventory system with variable lead time and uncertain market demand (2018)A vendor–buyer integrated inv…An integrated lot-sizing model for imperfect production with multiple disposals of defective items (2017)An integrated lot-sizing mode…Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system (2016)Stochastic machine breakdown …Analysis of preferred customer enablers from supplier’s perspective (2016)Analysis of preferred custome…An integrated optimal inventory lot-sizing and vehicle-routing model for a multisupplier single-assembler system with JIT delivery (2014)An integrated optimal invento…Economic Production Cycles with Imperfect Production Processes (1986)Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction (1986)The EOQ repair and waste disposal model with variable setup numbers (1996)The extended EOQ repair and waste disposal model (1996)An optimal production run time with imperfect production processes and allowable shortages (2002)Dynamic Version of the Economic Lot Size Model (2004)Optimum production lot size model for a system with deteriorating inventory (1975)Economic production quantity model for items with imperfect quality (2000)An optimal replenishment policy for non-instantaneous deteriorating items with stock-dependent demand and partial backlogging (2005)Joint procurement and production decisions in remanufacturing under quality and demand uncertainty (2008)An economic production quantity model with random defective rate, rework process and backorders for a single stage production system (2014)An EOQ model with partial backordering and advance payments for an evaporating item (2014)An integrated inventory model for a single supplier-single customer problem (1977)“A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* (1988)Optimizing inventory decisions in a multi-stage multi-customer supply chain (2003)The joint economic lot sizing problem: Review and extensions (2007)The Bargaining Problem (1950)The interdisciplinary study of coordination (1994)Designing and Managing the Supply Chain (2002)Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers (2008)Supply chain coordination with trade credit and quantity discount incorporating default risk (2014)Coordination of social responsibility and order quantity in a two-echelon supply chain: A collaborative decision-making perspective (2016)Analysis of Inventory Systems. (1964)Japanese Manufacturing Techniques: Nine Hidden Lessons in Simplicity (1983)A one-vendor multi-buyer integrated production-inventory model: The ‘Consignment Stock’ case (2008)Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand (2011)Involvement of controllable lead time and variable demand for a smart manufacturing system under a supply chain management (2021)A Quantity Discount Pricing Model to Increase Vendor Profits (1984)Optimal pricing, shipment and payment policy for an integrated supplier–buyer inventory model with two-part trade credit (2007)Green-component life-cycle value on design and reverse manufacturing in semi-closed supply chain (2008)Three-echelon supply chain model considering carbon emission and item deterioration (2018)The single-vendor single-buyer integrated production-inventory model with a generalised policy (1997)Optimizing shipment, ordering and pricing policies in a two-stage supply chain with price-sensitive demand (2009)A stochastic aggregate production planning model in a green supply chain: Considering flexible lead times, nonlinear purchase and shortage cost functions (2013)Vendor-managed inventory with consignment stock agreement for single vendor–single buyer under the emission-trading scheme (2013)Optimal Ordering Strategies for Announced Price Increases (1985)An Analytical Determination of Lead Time with Normal Demand (1991)A dynamic product quality evaluation based pricing model for perishable food supply chains (2012)Vendor selection criteria and methods (1991)Coordinated supply chain management (1996)Economic production quantity model for items with imperfect quality subject to learning effects (2008)An economic order quantity (EOQ) for items with imperfect quality and inspection errors (2010)EOQ models for a coordinated two-level international supply chain considering imperfect items and environmental impact (2011)
this work references cited by second hop

References

  • 1986A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR1,034 cited
  • 1982Principles of inventory and materials management697 cited
  • 1992Production Lot Sizing with Machine Breakdowns271 cited
  • 2000Determination of economic production–shipment policy for a single-vendor–single-buyer system261 cited
  • 2003Integrated single vendor single buyer model with stochastic demand and variable lead time248 cited
  • 2006Coordinating a two-level supply chain with delay in payments and profit sharing233 cited
  • 2003An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration209 cited
  • 2006An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation193 cited
  • 2003A JIT lot-splitting model for supply chain management: Enhancing buyer–supplier linkage188 cited
  • 2006Production and shipment lot sizing in a vendor–buyer supply chain with transportation cost171 cited
  • 2000An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment149 cited
  • 2004Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy89 cited
  • 2008An integrated vendor–buyer inventory model with backorder price discount and effective investment to reduce ordering cost78 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2006Optimal production and shipment models for a single-vendor–single-buyer integrated system77 cited
  • 2001A discrete-time Markov production-inventory model with machine breakdowns74 cited
  • 2007A genetic algorithm approach to optimize a multi-products EPQ model with discrete delivery orders and constrained space69 cited
  • Cited by

    • 2020Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory33 cited
    • 2016Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system30 cited
    • 2014An integrated optimal inventory lot-sizing and vehicle-routing model for a multisupplier single-assembler system with JIT delivery30 cited
    • 2024Economic production quantity models for an imperfect manufacturing system with strict inspection29 cited
    • 2021Optimal integrated production-inventory system considering shortages and discrete delivery orders27 cited
    • 2019A vendor–buyer inventory model with lot-size and production rate dependent lead time under time value of money21 cited
    • 2017An integrated lot-sizing model for imperfect production with multiple disposals of defective items18 cited
    • 2018A vendor–buyer integrated inventory system with variable lead time and uncertain market demand17 cited
    • 2016Analysis of preferred customer enablers from supplier’s perspective15 cited