SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Applying Modified Minimum Moment Method to Multiple Resource Leveling
8 references·6 citing·35 second hop
Applying Modified Minimum Moment Method to Multiple Resource Leveling (2001)Applying Modified Minimum Moment Method t…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach (1999)Multiheuristic Approach for R…GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)GA-Based Multicriteria Optima…Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Resource Leveling of Linear S…Construction Resource Scheduling with Genetic Algorithms (1996)Construction Resource Schedul…Packing Method for Resource Leveling (Pack) (1990)Packing Method for Resource L…Precedence and Arrow Networking Techniques for Construction (1980)Precedence and Arrow Networki…Construction performance control by networks (1976)Construction performance cont…A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags (2016)A Parallel Branch and Bound A…A Genetic Algorithm for Optimal Resource-driven Project Scheduling (2015)A Genetic Algorithm for Optim…Project Scheduling by Integration of Time Cost Trade-off and Constrained Resource Scheduling (2014)Project Scheduling by Integra…IMPACTS OF DIFFERENT OBJECTIVE FUNCTIONS ON RESOURCE LEVELING IN CONSTRUCTION PROJECTS: A CASE STUDY (2014)IMPACTS OF DIFFERENT OBJECTIV…Efficient Hybrid Genetic Algorithm for Resource Leveling via Activity Splitting (2010)Efficient Hybrid Genetic Algo…Entropy-based scheduling of resource-constrained construction projects (2009)Entropy-based scheduling of r…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Multi-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm (2016)Modelling the resource constrained time-cost-quality-safety risk-environmental impact trade-off using opposition-based NSGA III (2023)Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects (2023)Multiple Attribute Decision Making (1981)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Critical path methods in construction practice (1970)Project Management With Cpm, Pert and Precedence Diagramming (1983)Resource Leveling in Construction by Optimization (1989)Mixed-integer linear programming for resource leveling problems (2012)Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search (2015)Planning and analysis of construction operations (1992)Scheduling Projects with Repeating Activities (1998)Work Continuity Constraints in Project Scheduling (2005)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (2009)Multiresource Leveling in Line-of-Balance Scheduling (2013)Schedule Optimization Using Genetic Algorithms (1991)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Evolutionary resource scheduler for linear projects (2007)The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm (2012)Extensions of the resource-constrained project scheduling problem (2023)Construction Project Scheduling (1991)Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)Stochastic Construction Time-Cost Trade-Off Analysis (2000)Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs (1997)The resource renting problem subject to temporal constraints (2001)A genetic algorithm for the robust resource leveling problem (2015)
this work references cited by second hop

References

  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 1996Construction Resource Scheduling with Genetic Algorithms241 cited
  • 1999GA-Based Multicriteria Optimal Model for Construction Scheduling232 cited
  • 1980Precedence and Arrow Networking Techniques for Construction167 cited
  • 1990Packing Method for Resource Leveling (Pack)141 cited
  • 1998Resource Leveling of Linear Schedules Using Integer Linear Programming120 cited
  • 1999Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach95 cited
  • 1976Construction performance control by networks94 cited

Cited by

  • 2014Project Scheduling by Integration of Time Cost Trade-off and Constrained Resource Scheduling56 cited
  • 2010Efficient Hybrid Genetic Algorithm for Resource Leveling via Activity Splitting52 cited
  • 2015A Genetic Algorithm for Optimal Resource-driven Project Scheduling44 cited
  • 2016A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags41 cited
  • 2014IMPACTS OF DIFFERENT OBJECTIVE FUNCTIONS ON RESOURCE LEVELING IN CONSTRUCTION PROJECTS: A CASE STUDY40 cited
  • 2009Entropy-based scheduling of resource-constrained construction projects39 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work