No open-access location is known for this record yet.
No open-access location is known for this record yet.
Abstract This article presents new results which should be useful in finding production decisions while solving the dynamic lot sizing problem of Wagner–Whitin on a rolling horizon basis. In a rolling horizon environment, managers obtain decisions for the first period (or the first few periods) by looking at the forecasts for several periods. This article develops procedures to find optimal decisions for any specified number of initial periods (called planning horizon in the article) by using the forecast data for the minimum possible number of future periods. Computational results comparing these procedures with the other procedures reported in the literature are very encouraging.
Loading…
Stored only when both papers are in the corpus — 50 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.