SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Total Float Traded as Commodity
1 references·6 citing·27 second hop
Total Float Traded as Commodity (1991)Total Float Traded as CommodityThe Development of the Construction Engineer: Past Progress and Future Problems (1991)The Development of the Constr…Time–Cost Optimization Model Considering Float-Consumption Impact (2015)Time–Cost Optimization Model …Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices (2014)Integrated Approach to Overco…Float Allocation Using the Total Risk Approach (2009)Float Allocation Using the To…FLORA: New Forensic Schedule Analysis Technique (2008)FLORA: New Forensic Schedule …Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract (2007)Preallocation of Total Float …Effect of resource constraints on float calculations in project networks (1996)Effect of resource constraint…GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)Project Management: The Managerial Process (1999)Project management: the managerial process (2010)Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming (2019)Activity Uncrashing Heuristic with Noncritical Activity Rescheduling Method for the Discrete Time-Cost Trade-Off Problem (2020)A Digitalized Design Risk Analysis Tool with Machine-Learning Algorithm for EPC Contractor’s Technical Specifications Assessment on Bidding (2021)Quantifying the causes and costs of rework in construction (2000)Selecting a delay analysis method in resolving construction claims (2005)System dynamics applied to project management: a survey, assessment, and directions for future research (2007)Critical-Path Planning and Scheduling: Mathematical Basis (1961)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Proceedings of the 2001 Winter Simulation Conference (2001)Critical clouds and critical sets in resource-constrained projects (2004)Review of Resource-Constrained Scheduling Algorithms (2019)Construction delay analysis techniques (1996)Construction Delay Computation Method (2001)Concurrent Delays and Apportionment of Damages (2010)Who Owns Float? (1990)Construction Project Scheduling (1991)Wolf-Bird Optimizer (WBO): A novel metaheuristic algorithm for Building Information Modeling-based resource tradeoff (2023)Construction Scheduling: Preparation, Liability, and Claims (1991)Construction Law Handbook 2009 (2009)A method for project schedule delay analysis (2018)Importance of Capacity Constraints to Construction Cost and Schedule (2000)Evaluation of the Resource-Constrained Critical Path Method Algorithms (2005)Litigation in Construction Contracts: Literature Review (2019)
this work references cited by second hop

References

  • 1991The Development of the Construction Engineer: Past Progress and Future Problems58 cited

Cited by

  • 2015Time–Cost Optimization Model Considering Float-Consumption Impact48 cited
  • 1996Effect of resource constraints on float calculations in project networks42 cited
  • 2007Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract41 cited
  • 2009Float Allocation Using the Total Risk Approach35 cited
  • 2008FLORA: New Forensic Schedule Analysis Technique29 cited
  • 2014Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices25 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work