SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
On a Fix-and-Relax Framework for a Class of Project Scheduling Problems
1 references·3 citing·14 second hop
On a Fix-and-Relax Framework for a Class of Project Scheduling Problems (2005)On a Fix-and-Relax Framework for a Class …Scheduling of Resource-Constrained Projects (2000)Scheduling of Resource-Constr…Logistics and Supply Chain Management (2024)Logistics and Supply Chain Ma…Multi-period single-allocation hub location-routing: Models and heuristic solutions (2023)Multi-period single-allocatio…Heuristic Solutions for a Class of Stochastic Uncapacitated p-Hub Median Problems (2019)Heuristic Solutions for a Cla…A quadratic integer program for the location of interacting hub facilities (1987)Efficient algorithms for the uncapacitated single allocation p-hub median problem (1996)Network hub location problems: The state of the art (2007)The stochastic multi-modal hub location problem with direct link strategy and multiple capacity levels for cargo delivery systems (2020)Stochastic hub location problems with Bernoulli demands (2022)The Location of Interacting Hub Facilities (1986)The Price of Robustness (2004)A postponement model to determine the customisation degree applied to the notebook computer industry (2008)Facility location and supply chain management – A review (2008)Tanzanian SMEs’ Perceptions towards Adoption of Supply Chain Management (SCM) Strategy (2010)Review of quantitative methods for supply chain resilience analysis (2019)A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem (2007)A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (2008)A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem (2014)
this work references cited by second hop

References

  • 2000Scheduling of Resource-Constrained Projects181 cited

Cited by

  • 2024Logistics and Supply Chain Management29 cited
  • 2019Heuristic Solutions for a Class of Stochastic Uncapacitated p-Hub Median Problems25 cited
  • 2023Multi-period single-allocation hub location-routing: Models and heuristic solutions25 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work