Prescribing and Implementing the Risk in Early Design (RED) Method
4 references·2 citing·18 second hop
Prescribing and Implementing the Risk in Early Design (RED) Method (2006)Prescribing and Implementing the Risk in …Probabilistic Risk Assessment and Management for Engineers and Scientists (1996)Probabilistic Risk Assessment…Fault Tree Handbook (1987)Fault Tree Handbookb'Fault Tree Handbook' (1981)b'Fault Tree Handbook'Operability Studies and Hazard Analysis (1974)Operability Studies and Hazar…Design Margins as a Key to Understanding Design Iteration (2014)Design Margins as a Key to Un…Extension of Stress and Strength Interference Theory for Conceptual Design-for-Reliability (2009)Extension of Stress and Stren…Axiomatic Design: Advances And Applications (2001)Introduction to Quality Engineering (2008)Research Progress Analysis of Reliability Design Method Based on Axiomatic Design Theory (2016)A reliability-based design framework for early stages of design process (2017)Change and customisation in complex engineering domains (2004)Predicting Change Propagation in Complex Design (2004)This is Not a Boundary Object: Reflections on the Origin of a Concept (2010)An effective design freeze strategy for establishing design rules in modular product development (2024)Error and uncertainty in modeling and simulation (2002)Verification, validation, and predictive capability in computational engineering and physics (2004)Risks and decisions for conservation and environmental management (2005)Risk analysis and assessment methodologies in the work sites: On a review, classification and comparative study of the scientific literature of the period 2000–2009 (2011)Imprecise probabilities in engineering analyses (2013)Methods and models in process safety and risk management: Past, present and future (2015)A graphical approach to cause and effect analysis of chemical processing systems (1980)A review of techniques for risk management in projects (2007)A critique of the Hazard and Operability (HAZOP) study (2014)An overview of fault tree analysis and its application in model based dependability analysis (2017)
this work references cited by second hop

References

  • 1987Fault Tree Handbook775 cited
  • 1981b'Fault Tree Handbook'670 cited
  • 1996Probabilistic Risk Assessment and Management for Engineers and Scientists611 cited
  • 1974Operability Studies and Hazard Analysis252 cited

Cited by

  • 2009Extension of Stress and Strength Interference Theory for Conceptual Design-for-Reliability27 cited
  • 2014Design Margins as a Key to Understanding Design Iteration12 cited