Criticism of CPM for Project Planning Analysis
3 references·6 citing·36 second hop
Criticism of CPM for Project Planning Analysis (1984)Criticism of CPM for Project Planning Ana…Time Space Scheduling Method (1982)Time Space Scheduling MethodLinear Scheduling Method for Highway Construction (1981)Linear Scheduling Method for …Construction Planning—Beyond the Critical Path (1980)Construction Planning—Beyond …If CPM is so bad, why have we been using it so long? (2014)If CPM is so bad, why have we…Stakeholder Management in International Projects (2010)Stakeholder Management in Int…Delay Analysis within Construction Contracting Organizations (2008)Delay Analysis within Constru…Elicitation of subjective probabilities for economic risk analysis: An investigation (1993)Elicitation of subjective pro…Construction Decision Support System for Delay Analysis (1993)Construction Decision Support…Soft Logic in Network Analysis (1988)Soft Logic in Network AnalysisHigher Education for Business (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Thinking, Fast and Slow (2011)Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle East (2017)Improving workflow and resource usage in construction schedules through location-based management system (LBMS) (2018)Group Techniques for Program Planning (1975)Judgement under Uncertainty: Heuristics and Biases (1983)Judgement under Uncertainty: Heuristics and Biases (1985)Probability distributions of facilities management costs for whole life cycle costing in acute care NHS hospital buildings (2002)Expert elicitation and Bayesian analysis of construction contract risks: an investigation (2006)Assessing the Economic Rationality of Remanufacturing Products* (2008)The Nature of Managerial Work (1974)Qualitative Research for Education: An Introduction to Theory and Methods (1997)Qualitative inquiry and research design: choosing among five traditions. (1998)Consultants’ Perceptions on Construction Delay Analysis Methodologies (2009)An Overarching Review on Delay Analyses in Construction Projects (2021)Dynamic networks for resilience-driven management of infrastructure projects (2022)Professional Construction Management (1976)Ghost: Project Network Generator (1988)Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method (2009)Precedence and Arrow Networking Techniques for Construction (1980)Project Management With Cpm, Pert and Precedence Diagramming (1983)Impact of soft logic on the probabilistic duration of construction projects (2005)Case Study Research: Design and Methods (1984)Handbook of Qualitative Research (1994)Strategic management a stakeholder approach (2010)Crossing digital frontiers with cultural intelligence - a new paradigm for project managers (2023)New Generation of Planning Structures (1993)Resource-driven scheduling of repetitive activities (1998)Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)Application of Linear Scheduling (1986)Line‐of‐Balance Scheduling in Pavement Construction (1986)A genetic algorithm-based method for scheduling repetitive construction projects (2009)HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects (1994)Comparison of Linear Scheduling Model and Repetitive Scheduling Method (2003)Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions (2009)
this work references cited by second hop

References

  • 1981Linear Scheduling Method for Highway Construction159 cited
  • 1980Construction Planning—Beyond the Critical Path123 cited
  • 1982Time Space Scheduling Method96 cited

Cited by

  • 1993Construction Decision Support System for Delay Analysis71 cited
  • 2008Delay Analysis within Construction Contracting Organizations67 cited
  • 2010Stakeholder Management in International Projects50 cited
  • 2014If CPM is so bad, why have we been using it so long?46 cited
  • 1988Soft Logic in Network Analysis40 cited
  • 1993Elicitation of subjective probabilities for economic risk analysis: An investigation20 cited