SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Generalized spare ordering policies with random lead time
5 references·7 citing·27 second hop
Generalized spare ordering policies with random lead time (1986)Generalized spare ordering policies with …An optimal ordering policy for a spare unit with lead time (1978)An optimal ordering policy fo…An ordering policy with lead time (1977)An ordering policy with lead …Analysis of Inventory Systems. (1964)Analysis of Inventory Systems.Principles of Engineering Economy. (1939)Principles of Engineering Eco…Principles of Engineering Economy (1932)Principles of Engineering Eco…Analysis of batch arrival queue with randomized vacation policy and an un-reliable server (2012)Analysis of batch arrival que…A batch arrival queue under randomised multi-vacation policy with unreliable server and repair (2010)A batch arrival queue under r…Integrated Spare Parts Management (2009)Integrated Spare Parts Manage…Modeling and Analyzing a Joint Optimization Policy of Block-Replacement and Spare Inventory With Random-Leadtime (2008)Modeling and Analyzing a Join…Optimal spare ordering policy under a rebate warranty (2007)Optimal spare ordering policy…Optimal continuous review policies for spare part provisioning with random lead times (1998)Optimal continuous review pol…Generalized ordering policies with general random minimal repair costs and random lead times (1994)Generalized ordering policies…An Ordering Policy for Repairable Stock Items (1968)Joint maintenance and spare-parts inventory models: a review and discussion of practical stock-keeping rules (2023)Poisson Arrivals See Time Averages (1982)The Goal: A Process of Ongoing Improvement (1984)Queueing systems with vacations ? A survey (1986)Machine repair problem with an unreliable server and controlled arrival of failed machines (2013)Profit optimisation of the multiple-vacation machine repair problem using particle swarm optimisation (2013)A delivery‐lag inventory model with an emergency provision (the single‐period case) (1961)A Continuous Review Model for an Inventory System with Two Supply Modes (1988)Principles of engineering economy (1962)Market share and warranty costs for renewable warranty programs (1997)Channel coordination with manufacturer’s return policies within a newsvendor framework (2011)Reliable flow in forward and after-sales supply chains considering propagated uncertainty (2016)An integrated inventory model for items with acceptable defective items under warranty and quality improvement investment (2017)Production and inventory management (1983)Inventory management and production planning and scheduling (1999)Multi-criteria classification of spare parts inventories – a web based approach (2015)A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR (1986)Lot Sizing with Random Yields: A Review (1995)The single-period (news-vendor) problem: literature review and suggestions for future research (1999)The Derivation of Probabilistic Information for the Evaluation of Risky Investments (1963)A compendium and comparison of 25 project evaluation techniques. Part 1: Net present value and rate of return methods (1995)The development of life-cycle costing for buildings (2015)Joint hybrid repair and remanufacturing systems and supply control (2009)Net Present Value and Rate of Return: Implicit and Explicit Reinvestment Assumptions (1988)A compendium and comparison of 25 project evaluation techniques. Part 2: Ratio, payback, and accounting methods (1995)A multi-period reverse logistics optimisation model for end-of-life vehicles recovery based on EU Directive (2008)
this work references cited by second hop

References

  • 1964Analysis of Inventory Systems.2,345 cited
  • 1932Principles of Engineering Economy290 cited
  • 1939Principles of Engineering Economy.91 cited
  • 1978An optimal ordering policy for a spare unit with lead time57 cited
  • 1977An ordering policy with lead time52 cited

Cited by

  • 2008Modeling and Analyzing a Joint Optimization Policy of Block-Replacement and Spare Inventory With Random-Leadtime42 cited
  • 2007Optimal spare ordering policy under a rebate warranty23 cited
  • 2010A batch arrival queue under randomised multi-vacation policy with unreliable server and repair20 cited
  • 1998Optimal continuous review policies for spare part provisioning with random lead times17 cited
  • 2009Integrated Spare Parts Management16 cited
  • 1994Generalized ordering policies with general random minimal repair costs and random lead times15 cited
  • 2012Analysis of batch arrival queue with randomized vacation policy and an un-reliable server14 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work