SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Incentive/Disincentive Guidelines for Highway Construction Contracts
0 references·8 citing·25 second hop
Incentive/Disincentive Guidelines for Highway Construction Contracts (1995)Incentive/Disincentive Guidelines for Hig…Double Moral Hazard and Risk-Sharing in Construction Projects (2019)Double Moral Hazard and Risk-…Principal-Agent Model of Risk Allocation in Construction Contracts and Its Critique (2013)Principal-Agent Model of Risk…WORK ZONE ROAD USER COSTS (2011)WORK ZONE ROAD USER COSTSSchedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects (2011)Schedule Effectiveness of Alt…Decision support model for incentives/disincentives time–cost tradeoff (2011)Decision support model for in…Evaluation of Alternative Contracting Techniques on FDOT Construction Projects (2007)Evaluation of Alternative Con…Setting Maximum Incentive for Incentive/Disincentive Contracts for Highway Projects (2004)Setting Maximum Incentive for…Construction Congestion Cost (CO 3 ) Traffic Impact and Construction Cost (2000)Construction Congestion Cost …The Costs and Benefits of Ownership: A Theory of Vertical and Lateral Integration (1986)The Economic Institutions of Capitalism (1987)Agency Theory: An Assessment and Review (1989)Impacts of uncertain project duration and asymmetric risk sensitivity information in project management (2015)Transitional Public–Private Partnership Model in China: Contracting with Little Recourse to Contracts (2016)Risk Assessment Model for Optimal Gain–Pain Share Ratio in Target Cost Contract for Construction Projects (2021)Time Is Money: Innovative Contracting Methods in Highway Construction (1995)Construction Congestion Cost (CO 3 ) Basic Model (2000)Incentive/Disincentive Contracts: Perceptions of Owners and Contractors (1998)Grand challenges for engineering (2009)Construction Project Scheduling (1991)Optimal Incentive Contract with Risk-Neutral Contractor (2012)Incentive Contracts in Serial Stochastic Projects (2015)A+B Bidding Method—Hidden Success Story for Highway Construction (1995)Incentive/Disincentive Provisions in Highway Contracts (1997)The New Rational Manager (1965)Model for Public Sector Design-Build Project Selection (1998)Summary of Travel Trends (2004)A Theory of Incentives in Procurement and Regulation (1993)A theory of incentives in procurement and regulation (1994)Incentives versus Transaction Costs: A Theory of Procurement Contracts (2001)Incentive Mechanisms for Project Success (2002)Systematic construction risk, cost estimation mechanism and unit price movements (2014)Cost Overruns in Public Sector Investment Projects (2016)Variation in cost overruns of transportation projects: an econometric meta-regression analysis of studies reported in the literature (2017)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2004Setting Maximum Incentive for Incentive/Disincentive Contracts for Highway Projects63 cited
  • 2013Principal-Agent Model of Risk Allocation in Construction Contracts and Its Critique62 cited
  • 2007Evaluation of Alternative Contracting Techniques on FDOT Construction Projects51 cited
  • 2011Decision support model for incentives/disincentives time–cost tradeoff37 cited
  • 2011Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects36 cited
  • 2019Double Moral Hazard and Risk-Sharing in Construction Projects35 cited
  • 2000Construction Congestion Cost (CO 3 ) Traffic Impact and Construction Cost14 cited
  • 2011WORK ZONE ROAD USER COSTS6 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work