The Application of Genetic Algorithms to Resource Scheduling
0 references·4 citing·21 second hop
The Application of Genetic Algorithms to Resource Scheduling (1991)The Application of Genetic Algorithms to …Bilevel and multi-objective dynamic construction site layout and security planning (2015)Bilevel and multi-objective d…Evolving Complex Organizational Structures in New and Unpredictable Environments (2000)Evolving Complex Organization…Solving a Real-World Problem Using an Evolving Heuristically Driven Schedule Builder (1998)Solving a Real-World Problem …A genetic algorithm for resource-constrained scheduling (1996)A genetic algorithm for resou…Strategic Change: "Logical Incrementalism.". (1978)The Visible Hand: The Managerial Revolution in American Business (1978)First-mover advantages (1988)Initiating strategic planning (2005)Clusters of entrepreneurs (2006)Organizational development and transformational learning approaches in process innovations (2010)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Genetic Algorithms for Project Management (2001)Time-line based model for software project scheduling with genetic algorithms (2008)Automation in construction scheduling: a review of the literature (2015)On the Stackelberg strategy in nonzero-sum games (1973)Operational Risk: Regulation, Analysis and Management (2003)Identifying Critical Infrastructure: The Median and Covering Facility Interdiction Problems (2004)Multi‐Criteria Optimization (2014)Noncooperative Game-Based Equilibrium Strategy to Address the Conflict between a Construction Company and Selected Suppliers (2017)Machine learning-aided cost prediction and optimization in construction operations (2021)Knowledge Discovery in a Hyper-heuristic for Course Timetabling Using Case-Based Reasoning (2003)An investigation of a tabu assisted hyper-reuristic genetic algorithm (2004)Hyperheuristics for managing a large collection of low level heuristics to schedule personnel (2004)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 1996A genetic algorithm for resource-constrained scheduling162 cited
  • 1998Solving a Real-World Problem Using an Evolving Heuristically Driven Schedule Builder61 cited
  • 2015Bilevel and multi-objective dynamic construction site layout and security planning48 cited
  • 2000Evolving Complex Organizational Structures in New and Unpredictable Environments13 cited