SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A multi-product newsboy problem with fuzzy customer demand and a storage space constraint
15 references·0 citing·33 second hop
A multi-product newsboy problem with fuzzy customer demand and a storage space constraint (2010)A multi-product newsboy problem with fuzz…Incorporating one-way substitution policy into the newsboy problem with imprecise customer demand (2008)Incorporating one-way substit…An inventory model for single-period products with reordering opportunities under fuzzy demand (2007)An inventory model for single…A single-period inventory model with fuzzy random variable demand (2005)A single-period inventory mod…Exact, approximate, and generic iterative models for the multi-product Newsboy problem with budget constraint (2003)Exact, approximate, and gener…Fuzzy models for single-period inventory problem (2002)Fuzzy models for single-perio…A single-period inventory model with fuzzy demand (2002)A single-period inventory mod…The Multi-Item Newsvendor Problem with a Budget Constraint and Fixed Ordering Costs (2000)The Multi-Item Newsvendor Pro…Robust multi-item newsboy models with a budget constraint (2000)Robust multi-item newsboy mod…An extended newsboy problem with shortage-level constraints (2000)An extended newsboy problem w…Fuzzy models for the newsboy problem (1996)Fuzzy models for the newsboy …The multi‐product multi‐constraint newsboy problem: Applications, formulation and solution (1995)The multi‐product multi‐const…On the Constrained Multi‐item Single‐period Inventory Problem (1993)On the Constrained Multi‐item…Ranking fuzzy numbers with integral value (1992)Ranking fuzzy numbers with in…An efficient heuristic for the multi‐item newsboy problem with a single constraint (1984)An efficient heuristic for th…Analysis of Inventory Systems. (1964)Analysis of Inventory Systems.Decision Systems for Inventory Management and Production Planning (1979)Production and Operations Analysis (1992)Adaptive Ordering and Pricing for Perishable Products (2000)Toward Robust Revenue Management: Competitive Analysis of Online Booking (2009)Multi-item production planning with carbon cap and trade mechanism (2013)The EOQ with backlogging derived without derivatives (1999)The single-period (news-vendor) problem: literature review and suggestions for future research (1999)An analysis of the multi-product newsboy problem with a budget constraint (2004)A quadratic programming approach to the multi-product newsvendor problem with side constraints (2006)Optimal acquisition and remanufacturing policies for multi-product remanufacturing systems (2015)Introduction to Operations Research (1968)Multiple Attribute Decision Making: Methods and Applications (1981)A bibliography of non-deterministic lot-sizing models (2013)Single-period inventory problem under uncertain environment (2013)Fuzzy inventory models: A comprehensive review (2017)Note—Effects of Centralization on Expected Costs in a Multi-Location Newsboy Problem (1979)The multi-product newsboy problem with supplier quantity discounts and a budget constraint (2010)Fuzzy sets (1965)FUZZY SET THEORY AND ITS APPLICATIONS (1986)Fuzzy sets (1996)Inventory management and production planning and scheduling (1999)Pricing and the Newsvendor Problem: A Review with Extensions (1999)Robust optimal policies of production and inventory with uncertain returns and demand (2009)Robust Optimization of Sums of Piecewise Linear Functions with Application to Inventory Problems (2016)A Review of Robust Operations Management under Model Uncertainty (2020)A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR (1986)Lot Sizing with Random Yields: A Review (1995)Fuzzy multi-product constraint newsboy problem (2006)A new approach for ranking fuzzy numbers by distance method (1998)Reasonable properties for the ordering of fuzzy quantities (II) (2001)Ranking fuzzy numbers with an area between the centroid point and original point (2002)A production inventory model with fuzzy random demand and with flexibility and reliability considerations (2008)Periodic review fuzzy inventory model with variable lead time and fuzzy demand (2015)
this work references cited by second hop

References

  • 1964Analysis of Inventory Systems.2,345 cited
  • 1992Ranking fuzzy numbers with integral value1,150 cited
  • 2005A single-period inventory model with fuzzy random variable demand158 cited
  • 2000Robust multi-item newsboy models with a budget constraint157 cited
  • 2002A single-period inventory model with fuzzy demand147 cited
  • 1996Fuzzy models for the newsboy problem132 cited
  • 2000The Multi-Item Newsvendor Problem with a Budget Constraint and Fixed Ordering Costs112 cited
  • 1995The multi‐product multi‐constraint newsboy problem: Applications, formulation and solution98 cited
  • 2002Fuzzy models for single-period inventory problem95 cited
  • 2003Exact, approximate, and generic iterative models for the multi-product Newsboy problem with budget constraint88 cited
  • 1984An efficient heuristic for the multi‐item newsboy problem with a single constraint88 cited
  • 1993On the Constrained Multi‐item Single‐period Inventory Problem71 cited
  • 2008Incorporating one-way substitution policy into the newsboy problem with imprecise customer demand64 cited
  • 2000An extended newsboy problem with shortage-level constraints61 cited
  • 2007An inventory model for single-period products with reordering opportunities under fuzzy demand

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

60 cited

Cited by

No citing works inside the corpus for this window.