SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Effect of rework strategies on cycle time
1 references·2 citing·9 second hop
Effect of rework strategies on cycle time (1995)Effect of rework strategies on cycle timeA Course in Simulation (1990)A Course in SimulationIncorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system (2019)Incorporating an expedited ra…Simultaneous determination of production and shipment decisions for a multi-product inventory system with a rework process (2016)Simultaneous determination of…Inventory management and production planning and scheduling (1999)Foundations of Inventory Management (2000)Production and Operations Analysis (2019)Integrated inventory models: The buyer-vendor coordination (1989)Optimization in operations research (1997)A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process (2013)Latin Hypercube Sampling of Gaussian Random Fields (1999)Re-engineering knock-out processes (2001)Some New Perspectives on the Method of Control Variates (2002)
this work references cited by second hop

References

  • 1990A Course in Simulation170 cited

Cited by

  • 2016Simultaneous determination of production and shipment decisions for a multi-product inventory system with a rework process17 cited
  • 2019Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system16 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work