No open-access location is known for this record yet.
No open-access location is known for this record yet.
For production processes involving low fraction non-conforming, the sample sizes of the usual attribute inspection plans are very large. A continuous sampling plan for such processes would also require either a large clearance interval or a large sampling fraction. This paper simplifies the approach of combining the lot by lot and continuous sampling plans recommended by Pesotchinsky (1987) and provides various performance measures for the combined plan. A discussion of the choice of the parameters is also given.
Loading…
Stored only when both papers are in the corpus — 6 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.