SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESS
4 references·16 citing·41 second hop
HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESS (1983)HEURISTIC LOT‐SIZING APPROACHES FOR DEALI…Dynamic Version of the Economic Lot Size Model (2004)Dynamic Version of the Econom…HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT* (1980)HEURISTIC LOT‐SIZING PERFORMA…An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints (1978)An Algorithm for the Dynamic …Dynamic Version of the Economic Lot Size Model (1958)Dynamic Version of the Econom…Chance-constrained formulations in rolling horizon production planning: an experimental study (2016)Chance-constrained formulatio…The optimal replenishment policy for time-varying stochastic demand under vendor managed inventory (2014)The optimal replenishment pol…Lot Sizing Heuristics Performance (2013)Lot Sizing Heuristics Perform…A simple approach for assessing the cost of system nervousness (2012)A simple approach for assessi…Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain (2008)Master production scheduling …Master production schedule time interval strategies in make-to-order supply chains¶ (2008)Master production schedule ti…Value of information exchange and synchronization in a multi-tier supply chain (2006)Value of information exchange…Material requirements planning with flexible bills-of-material (2005)Material requirements plannin…The impact of material coordination concepts on planning stability in supply chains (2000)The impact of material coordi…New lot-sizing formulations for less nervous production schedules (2000)New lot-sizing formulations f…Nervousness in inventory control: Analytical results (1994)Nervousness in inventory cont…Evaluating the impact of frequent engineering changes on MRP system performance (1994)Evaluating the impact of freq…Classification of inventory models and systems (1994)Classification of inventory m…Interaction effects on MRP nervousness (1990)Interaction effects on MRP ne…Operations Management: A Field Rediscovered (1987)Operations Management: A Fiel…THE PERFORMANCE OF A SIMPLE INCREMENTAL LOT‐SIZING RULE IN A MULTILEVEL INVENTORY ENVIRONMENT (1985)THE PERFORMANCE OF A SIMPLE I…MATHEMATICAL METHODS IN THE SOCIAL SCIENCES, 1959 (1960)The Bullwhip Effect—Impact of Stochastic Lead Time, Information Quality, and Information Sharing: A Simulation Study (2004)The Optimality of (S,s) Policies in the Dynamic Inventory Problem (2005)A reformulation for the stochastic lot sizing problem with service-level constraints (2014)The value of VMI beyond information sharing in a single supplier multiple retailers supply chain under a non-stationary (Rn, Sn) policy (2014)Analysis of production planning in a global manufacturing company with process mining (2018)What is the Right Supply Chain for Your Product (1997)Inventory management and production planning and scheduling (1999)Supply Chain Management: Strategy, Planning and Operations (2000)A novel mathematical model for a multi-period, multi-product optimal ordering problem considering expiry dates in a FEFO system (2016)Effect of two-echelon trade credit on pricing-inventory policy of non-instantaneous deteriorating products with probabilistic demand and deterioration functions (2016)Optimal inventory decisions under vendor managed inventory: Substitution effects and replenishment tactics (2016)Improved Heuristics for Multi-Stage Requirements Planning Systems (1982)A structured analysis of material requirements planning systems under combined demand and supply uncertainty (1993)Measuring system performance of an ERP-based supply chain (2006)Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results (1975)Purchasing Policy of New Containers Considering the Random Returns of Previously Issued Containers (1989)A theory of rolling horizon decision making (1991)Rolling horizon planning in supply chains: review, implications and directions for future research (2013)The Bullwhip Effect In Supply Chains 1 (1997)Operationalising form postponement from a decision-making perspective (2010)Aggregate planning and forecasting in make-to-order production systems (2015)Revisiting rescheduling: MRP nervousness and the bullwhip effect (2016)A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach (1969)Bounded Production and Inventory Models with Piecewise Concave Costs (1973)Capacity Acquisition, Subcontracting, and Lot Sizing (2001)Joint Production and Pricing Decisions with Setup Costs and Capacity Constraints (2006)Analysis of the maximum level policy in a production-distribution system (2011)A Comparison of Strategies to Dampen Nervousness in MRP Systems (1986)A SURVEY ON SUPPLY PLANNING UNDER UNCERTAINTIES IN MRP ENVIRONMENTS (2005)A mixed 0‐1 integer programming for inventory model (2008)Optimizing Logistics Processes in Cash Supply Chains (2014)Optimal Policies for a Multi-Echelon Inventory Problem (1960)Optimal Policies for a Multi-Echelon Inventory Problem (2004)Multi-facilities tactical planning robustness with experimental design (2008)Reducing schedule instability by identifying and omitting complexity-adding information flows at the supplier–customer interface (2013)Perishable Inventory Theory: A Review (1982)Network Design and Transportation Planning: Models and Algorithms (1984)Quantitative models for reverse logistics: A review (1997)Flow Coordination and Information Sharing in Supply Chains: Review, Implications, and Directions for Future Research (2002)Smart “Predict, then Optimize” (2021)
this work references cited by second hop

References

  • 1958Dynamic Version of the Economic Lot Size Model2,068 cited
  • 2004Dynamic Version of the Economic Lot Size Model2,055 cited
  • 1980HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT*191 cited
  • 1978An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints167 cited

Cited by

  • 1985THE PERFORMANCE OF A SIMPLE INCREMENTAL LOT‐SIZING RULE IN A MULTILEVEL INVENTORY ENVIRONMENT76 cited
  • 2014The optimal replenishment policy for time-varying stochastic demand under vendor managed inventory54 cited
  • 2000The impact of material coordination concepts on planning stability in supply chains53 cited
  • 2008Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain52 cited
  • 2012A simple approach for assessing the cost of system nervousness51 cited
  • 2000New lot-sizing formulations for less nervous production schedules51 cited
  • 2006Value of information exchange and synchronization in a multi-tier supply chain45 cited
  • 2013Lot Sizing Heuristics Performance43 cited
  • 1990Interaction effects on MRP nervousness43 cited
  • 1994Evaluating the impact of frequent engineering changes on MRP system performance40 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2016Chance-constrained formulations in rolling horizon production planning: an experimental study36 cited
  • 2005Material requirements planning with flexible bills-of-material36 cited
  • 1994Nervousness in inventory control: Analytical results33 cited
  • 1987Operations Management: A Field Rediscovered30 cited
  • 2008Master production schedule time interval strategies in make-to-order supply chains¶29 cited
  • 1994Classification of inventory models and systems26 cited