SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A chronographic method for construction project planning
11 references·1 citing·38 second hop
A chronographic method for construction project planning (2006)A chronographic method for construction p…Critical Path Method with Multiple Calendars (2005)Critical Path Method with Mul…Decision Support for Project Management using A Chronographic Approach (2002)Decision Support for Project …Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects (2001)Dynamic Planning and Control …Simulation-Based Scheduling with Continuous Activity Relationships (1998)Simulation-Based Scheduling w…Construction Planning and Scheduling (1997)Construction Planning and Sch…Comprehensive project management: integrating optimization models, management principles, and computers (1995)Comprehensive project managem…A model-based method for organizing tasks in product development (1994)A model-based method for orga…Hierarchical Rule‐Based Activity Duration Estimation (1987)Hierarchical Rule‐Based Activ…Precedence diagramming method: Some unusual characteristics and their implications for project managers (1981)Precedence diagramming method…Fencing a Bar Chart (1981)Fencing a Bar ChartCritical path methods in construction practice (1970)Critical path methods in cons…The analysis of information flow interdependencies within projects (2020)The analysis of information f…A NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY (1962)Management Guide to PERT/CPM (1969)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Exact algorithm for matrix-based project planning problems (2015)Modeling project criticality in IT project portfolios (2018)Geography of domestication. Englewood Cliffs, New Jersey, USA, Prentice-Hall, Inc. (1970)Probability Concepts in Engineering Planning and Design (1975)Project Management With Cpm, Pert and Precedence Diagramming (1983)Hybrid Expert System for Construction Planning and Scheduling (1990)State of the art in construction simulation (1992)A decision support framework for estimating project duration under the impact of weather (2018)System Dynamics Modeling for Project Management (1992)Dynamic change management for construction: introducing the change cycle into model‐based project management (2003)Quality and Change Management Model for Large Scale Concurrent Design and Construction Projects (2005)Integrating system dynamics and fuzzy logic modelling for construction risk management (2008)Network analysis for planning and scheduling (1970)Construction Project Scheduling (1991)Project Management in Construction: Software Use and Research Directions (2001)Real-Time Construction Schedule Analysis of Long-Distance Diversion Tunnels Based on Lithological Predictions Using a Markov Process (2014)An Analytical Study of the PERT Assumptions (1964)VPM Scheduling for High-Rise Buildings (1975)New Generation of Planning Structures (1993)Managing the Flow of Technology: Technology Transfer and the Dissemination of Technological Information Within the R&D Organization (1977)Product development performance: strategy, organization, and management in the world auto industry (1991)An exploration towards a production theory and its application to construction (2000)Applying the design structure matrix to system decomposition and integration problems: a review and new directions (2001)Product Development Decisions: A Review of the Literature (2001)The Sources of Innovation (2007)Linear scheduling model: the development of a linear scheduling model with micro computer applications for highway construction project control (1995)Packing Method for Resource Leveling (Pack) (1990)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Understanding and managing iterative error and change cycles in construction (2007)Operations Research Applications (2008)Simulating Uncertainties in Construction Projects with Chronographical Scheduling Logic (2016)FACTORS AFFECTING LABOUR PRODUCTIVITY IN BUILDING PROJECTS IN THE GAZA STRIP (2007)Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system (2010)Factors Affecting Construction Labor Productivity in Kuwait (2011)
this work references cited by second hop

References

  • 1994A model-based method for organizing tasks in product development1,023 cited
  • 2001Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects157 cited
  • 1970Critical path methods in construction practice145 cited
  • 1997Construction Planning and Scheduling106 cited
  • 1981Precedence diagramming method: Some unusual characteristics and their implications for project managers81 cited
  • 1987Hierarchical Rule‐Based Activity Duration Estimation65 cited
  • 1995Comprehensive project management: integrating optimization models, management principles, and computers51 cited
  • 1998Simulation-Based Scheduling with Continuous Activity Relationships36 cited
  • 2005Critical Path Method with Multiple Calendars31 cited
  • 1981Fencing a Bar Chart30 cited
  • 2002Decision Support for Project Management using A Chronographic Approach30 cited

Cited by

  • 2020The analysis of information flow interdependencies within projects29 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work