Risk Concession Model for Build/Operate/Transfer Contract Projects
3 references·16 citing·49 second hop
Risk Concession Model for Build/Operate/Transfer Contract Projects (2005)Risk Concession Model for Build/Operate/T…Build, Operate, Transfer: Paving the Way for Tomorrow's Infrastructure (2008)Build, Operate, Transfer: Pav…A note on “highway pricing and capacity choice in a road network under a build-operate-transfer scheme” (2002)A note on “highway pricing an…Highway pricing and capacity choice in a road network under a build–operate–transfer scheme (2000)Highway pricing and capacity …Optimizing the concession period of PPP projects for fair allocation of financial risk (2019)Optimizing the concession per…Investigating underlying factors of collaboration for construction projects in emerging economies using exploratory factor analysis (2019)Investigating underlying fact…Cluster Analysis of the Intellectual Structure of PPP Research (2018)Cluster Analysis of the Intel…Improving Sustainability Performance for Public-Private-Partnership (PPP) Projects (2016)Improving Sustainability Perf…A model for determining the optimal project life span and concession period of BOT projects (2016)A model for determining the o…Modeling the Concession Period and Subsidy for BOT Waste-to-Energy Incineration Projects (2015)Modeling the Concession Perio…Strategic design of cost savings guarantee in energy performance contracting under uncertainty (2014)Strategic design of cost savi…Reasonable concession period for build-operate-transfer road projects in the Philippines (2012)Reasonable concession period …A Decision Support System for the determination of concession period length in transportation project under BOT contract (2012)A Decision Support System for…System Dynamics (SD) -based concession pricing model for PPP highway projects (2011)System Dynamics (SD) -based c…Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects (2011)Integrating system dynamics a…Potential Obstacles to Successful Implementation of Public-Private Partnerships in Beijing and the Hong Kong Special Administrative Region (2009)Potential Obstacles to Succes…Build-Operate-Transfer in Infrastructure Projects in the United States (2007)Build-Operate-Transfer in Inf…Automated Approach to Negotiations of BOT Contracts with the Consideration of Project Risk (2007)Automated Approach to Negotia…A fuzzy simulation model for evaluating the concession items of public–private partnership schemes (2007)A fuzzy simulation model for …Determining a reasonable concession period for private sector provision of public works and service (2006)Determining a reasonable conc…CSFs in Competitive Tendering and Negotiation Model for BOT Projects (1996)Comparison of U.S. Project Delivery Systems (1998)Critical success factors for PPP/PFI projects in the UK construction industry (2005)Adopting innovative procurement techniques (2011)Perception of Residual Value Risk in Public Private Partnership Projects: Critical Review (2013)Implementation constraints in public-private partnership (2017)Financial Managemen:t Theory and Practice (1979)Game Theory for Applied Economists (1992)Risk Analysis: A Quantitative Guide (2000)Cooperative Game Theoretic Framework for Joint Resource Management in Construction (2013)Review of Public–Private Partnership Literature from a Project Lifecycle Perspective (2018)Current Applications of Game Theory in Construction Engineering and Management Research: A Social Network Analysis Approach (2021)Über ein Paradoxon aus der Verkehrsplanung (1968)CONGESTION THEORY AND TRANSPORT INVESTMENT (1969)Urban transportation networks: Equilibrium analysis with mathematical programming methods (1986)Multiclass Network Toll Design Problem with Social and Spatial Equity Constraints (2002)Design and evaluation of road pricing: state-of-the-art and methodological advances (2008)A review of emerging trends in global PPP research: analysis and visualization (2016)Fuzzy sets (1965)Fuzzy sets (1996)Business Dynamics (2000)A review of public-private partnership: critical factors of concession period (2016)Dynamic Modeling of Multifactor Construction Productivity for Equipment-Intensive Activities (2018)Risk management framework for construction projects in developing countries (2004)Assessing risk and uncertainty inherent in Chinese highway projects using AHP (2007)Preferred risk allocation in China’s public–private partnership (PPP) projects (2009)Infrastructure development through PPPs in India: criteria for sustainability assessment (2015)Public Private Partnerships: The Worldwide Revolution In Infrastructure Provision And Project Finance (2004)The allocation of risk in PPP/PFI construction projects in the UK (2004)Stakeholder management for public private partnerships (2006)Barriers to public private partnership projects in developing countries (2015)Government-led critical success factors in PPP infrastructure development (2015)Factors attracting private sector investments in public–private partnerships in developing countries (2017)Governmental role in BOT-led infrastructure development (2001)Valuation techniques for infrastructure investment decisions (2004)Determining concession periods and minimum revenue guarantees in public-private-partnership agreements (2019)Sustainable Performance Measurements for Public–Private Partnership Projects: Empirical Evidence from China (2019)Governance and sustainability (2008)A review of studies on Public–Private Partnership projects in the construction industry (2009)Examining the Interrelationship among Critical Success Factors of Public Private Partnership Infrastructure Projects (2016)Evaluating issues and outcomes associated with public–private partnership housing project delivery: Tanzanian practitioners’ preliminary observations (2018)Exploring the Risk Factors of Infrastructure PPP Projects for Sustainable Delivery: A Social Network Perspective (2020)Optimal Peak-Load Pricing, Investment, and Service Levels on Urban Expressways (1977)Economic Theory and the Cities (1985)Second-Best Congestion Pricing: The Case of an Untolled Alternative (1996)Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty (2007)Second-best road pricing through highway franchising (2007)Properties of Pareto-efficient contracts and regulations for road franchising (2009)Alternate Financing Strategies for Build-Operate-Transfer Projects (2003)
this work references cited by second hop

References

  • 2000Highway pricing and capacity choice in a road network under a build–operate–transfer scheme205 cited
  • 2008Build, Operate, Transfer: Paving the Way for Tomorrow's Infrastructure142 cited
  • 2002A note on “highway pricing and capacity choice in a road network under a build-operate-transfer scheme”71 cited

Cited by

  • 2009Potential Obstacles to Successful Implementation of Public-Private Partnerships in Beijing and the Hong Kong Special Administrative Region135 cited
  • 2011System Dynamics (SD) -based concession pricing model for PPP highway projects106 cited
  • 2016Improving Sustainability Performance for Public-Private-Partnership (PPP) Projects103 cited
  • 2011Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects91 cited
  • 2012Reasonable concession period for build-operate-transfer road projects in the Philippines87 cited
  • 2007Build-Operate-Transfer in Infrastructure Projects in the United States77 cited
  • 2016A model for determining the optimal project life span and concession period of BOT projects72 cited
  • 2007A fuzzy simulation model for evaluating the concession items of public–private partnership schemes67 cited
  • 2007Automated Approach to Negotiations of BOT Contracts with the Consideration of Project Risk64 cited
  • 2006Determining a reasonable concession period for private sector provision of public works and service

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

63 cited
  • 2018Cluster Analysis of the Intellectual Structure of PPP Research61 cited
  • 2014Strategic design of cost savings guarantee in energy performance contracting under uncertainty56 cited
  • 2019Investigating underlying factors of collaboration for construction projects in emerging economies using exploratory factor analysis56 cited
  • 2019Optimizing the concession period of PPP projects for fair allocation of financial risk51 cited
  • 2015Modeling the Concession Period and Subsidy for BOT Waste-to-Energy Incineration Projects49 cited
  • 2012A Decision Support System for the determination of concession period length in transportation project under BOT contract48 cited