Purpose Time is an important factor in any project, especially in construction projects. Although using detailed scheduling techniques is unavoidable, a model to predict or benchmark time performance has interested many researchers. For an exploratory purpose, this paper aims to investigate the time‐cost relationship proposed by Bromilow with data from construction projects in Korea. Design/methodology/approach The data are collected from 34 historical building projects in Korea. Construction cost is adjusted using a building price index. Analysis is carried out on variety of project characteristics. Findings It is shown that a time‐cost relationship is applicable to the Korean construction industry. Further analysis indicates that the original Bromilow time‐cost model is not the best fit regression form, and alternative models are proposed. Research limitations/implications The data are limited to a small sample of 34 building projects. This limitation arises because of the data collection approach, which is direct contact with historical project documents supplied by construction firms. Originality/value Models from this study can serve as a reference tool for practitioners in the early stages of building projects in Korea. The results from this study are not intended to reject or replace detailed construction scheduling techniques.
Loading…
Stored only when both papers are in the corpus — 28 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.