this work references cited by second hop· second hop is a sample of the most-cited connectionsReferences
- 2000Designing and managing the supply chain : concepts, strategies, and case studies2,195 cited
- 2000Designing and Managing the Supply Chain Concepts, Strategies, and Case Studies1,298 cited
- 1986Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction1,161 cited
- 1986Economic Production Cycles with Imperfect Production Processes1,049 cited
- 1986A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR1,034 cited
- 1977An integrated inventory model for a single supplier-single customer problem918 cited
- 2005Supply Chain Collaboration:725 cited
- 1988“A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT*646 cited
- 1997The single-vendor single-buyer integrated production-inventory model with a generalised policy495 cited
- 2012Supply chain coordination with emissions reduction incentives413 cited
- 1999The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem380 cited
- 2011The joint economic lot size problem: A review319 cited
- 2001Production lot sizing with the reworking of imperfect quality items produced287 cited
- 2010An economic order quantity (EOQ) for items with imperfect quality and inspection errors203 cited
Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work