SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Key Factors in Bid Reasoning Model
7 references·16 citing·39 second hop
Key Factors in Bid Reasoning Model (2000)Key Factors in Bid Reasoning ModelFundamentals of Decision Making and Priority Theory With the Analytic Hierarchy Process (2000)Fundamentals of Decision Maki…Critical Success Factors for Different Project Objectives (1999)Critical Success Factors for …Factors considered in tendering decisions by top UK contractors (1993)Factors considered in tenderi…Questionnaire Survey on Bidding in Construction (1988)Questionnaire Survey on Biddi…The analytic hierarchy process : planning, priority setting, resource allocation (1980)The analytic hierarchy proces…Bidding Strategies and Probabilities (1967)Bidding Strategies and Probab…A Competitive-Bidding Strategy (1956)A Competitive-Bidding StrategyCritical factors influencing the bid/no bid decision in the Australian construction industry (2016)Critical factors influencing …Optimized artificial intelligence models for predicting project award price (2015)Optimized artificial intellig…Modeling the Decision-Making Process Concerning Participation in Construction Bidding (2013)Modeling the Decision-Making …Bidding strategy to support decision-making by integrating fuzzy AHP and regression-based simulation (2013)Bidding strategy to support d…Application of Expert Evaluation Method to Determine the Importance of Operating Asphalt Mixing Plant Quality Criteria and Rank Correlation (2011)Application of Expert Evaluat…A novel two-phase group decision making approach for construction project selection in a fuzzy environment (2011)A novel two-phase group decis…THE CRITERIA FOR IDENTIFYING THE QUALITY OF PASSENGERS’ TRANSPORTATION BY RAILWAY AND THEIR RANKING USING AHP METHOD (2010)THE CRITERIA FOR IDENTIFYING …Contractor’s decision for bid profit reduction within opportunistic bidding behavior of claims recovery (2010)Contractor’s decision for bid…Construction project selection using fuzzy TOPSIS approach (2010)Construction project selectio…Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors (2009)Factors affecting the bid/no …Research on project selection system of pre-evaluation of engineering design project bidding (2008)Research on project selection…Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach (2008)Housing refurbishment contrac…AHP- and simulation-based budget determination procedure for public building construction projects (2008)AHP- and simulation-based bud…A web-based integrated system for international project risk management (2007)A web-based integrated system…A case-based decision support tool for bid mark-up estimation of international construction projects (2007)A case-based decision support…A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions (2006)A framework for contractors t…Fuzzy Sets and Systems - Theory and Applications (1980)Multiple Attribute Decision Making: Methods and Applications (1981)The Analytic Hierarchy Process (1985)A new design of the elimination and choice translating reality method for multi-criteria group decision-making in an intuitionistic fuzzy environment (2012)Site selection in waste management by the VIKOR method using linguistic assessment (2014)VIKOR and its Applications (2014)Taking Risks, the Management of Uncertainty (1987)Decisions with Multiple Objectives: Preferences and Value Tradeoffs. (1994)Managing Risk in Construction Projects (1998)Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects (2011)A knowledge-based risk mapping tool for cost estimation of international construction projects (2014)System Dynamics Approach for Investigating the Risk Effects on Schedule Delay in Infrastructure Projects (2016)The Analytic Hierarchy Process—A Survey of the Method and its Applications (1986)Critical factors in successful project implementation (1987)Framework of Success Criteria for Design/Build Projects (2002)Factors affecting cost performance: evidence from Indian construction projects (2005)The effect of relationship management on project performance in construction (2011)Fuzzy sets (1965)Simulation Modeling and Analysis. (1983)Fuzzy sets (1996)Fuzzy AHP Application for Supporting Contractors’ Bidding Decision (2018)APPLICATION OF MULTIPLE CRITERIA DECISION MAKING METHODS IN CONSTRUCTION: A SYSTEMATIC LITERATURE REVIEW (2021)Analytical hierarchy process (1994)Aggregating individual judgments and priorities with the analytic hierarchy process (1998)Multi-criteria decision analysis in environmental sciences: Ten years of applications and trends (2011)An application procedure for DEA (1989)An Analysis of Multi-Criteria Decision Making Methods (2013)A review of multi criteria decision making (MCDM) towards sustainable renewable energy development (2016)Modeling Competitive Bidding: A Critical Essay (1994)Auctions for conservation contracts: an empirical examination of Victoria's BushTender trial (2003)Towards a better modelling and assessment of construction risk: Insights from a literature review (2013)Decision‐Support System for Modeling Bid/No‐Bid Decision Problem (1990)Utility-Theory Model for Bid Markup Decisions (1996)The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore (2002)A survey of current cost estimating practices in the UK (2000)Compressing construction durations: lessons learned from Hong Kong building projects (2002)Identifying and assessing the critical risk factors in an underground rail project in Thailand: a factor analysis approach (2004)State of the Art—Auctions and Bidding Models: A Survey (1980)Game theory and empirical economics: The case of auction data (1997)
this work references cited by second hop

References

  • 1980The analytic hierarchy process : planning, priority setting, resource allocation6,272 cited
  • 2000Fundamentals of Decision Making and Priority Theory With the Analytic Hierarchy Process2,640 cited
  • 1999Critical Success Factors for Different Project Objectives615 cited
  • 1956A Competitive-Bidding Strategy527 cited
  • 1993Factors considered in tendering decisions by top UK contractors272 cited
  • 1967Bidding Strategies and Probabilities233 cited
  • 1988Questionnaire Survey on Bidding in Construction222 cited

Cited by

  • 2011A novel two-phase group decision making approach for construction project selection in a fuzzy environment156 cited
  • 2007A web-based integrated system for international project risk management144 cited
  • 2013Bidding strategy to support decision-making by integrating fuzzy AHP and regression-based simulation112 cited
  • 2006A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions106 cited
  • 2011Application of Expert Evaluation Method to Determine the Importance of Operating Asphalt Mixing Plant Quality Criteria and Rank Correlation105 cited
  • 2009Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors103 cited
  • 2008Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

101 cited
  • 2015Optimized artificial intelligence models for predicting project award price100 cited
  • 2007A case-based decision support tool for bid mark-up estimation of international construction projects99 cited
  • 2010THE CRITERIA FOR IDENTIFYING THE QUALITY OF PASSENGERS’ TRANSPORTATION BY RAILWAY AND THEIR RANKING USING AHP METHOD92 cited
  • 2013Modeling the Decision-Making Process Concerning Participation in Construction Bidding91 cited
  • 2010Construction project selection using fuzzy TOPSIS approach91 cited
  • 2008Research on project selection system of pre-evaluation of engineering design project bidding90 cited
  • 2010Contractor’s decision for bid profit reduction within opportunistic bidding behavior of claims recovery89 cited
  • 2008AHP- and simulation-based budget determination procedure for public building construction projects80 cited
  • 2016Critical factors influencing the bid/no bid decision in the Australian construction industry70 cited