SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Optimal lot size and offline inspection policy
11 references·0 citing·36 second hop
Optimal lot size and offline inspection policy (2009)Optimal lot size and offline inspection p…Optimal lot size and inspection policy for products sold with warranty (2005)Optimal lot size and inspecti…Supply chain management survey of Swedish manufacturing firms (2003)Supply chain management surve…Optimal lot sizing for products sold under free-repair warranty (2003)Optimal lot sizing for produc…Simultaneous determination of the optimal production–inventory and product inspection policies for a deteriorating production system (2001)Simultaneous determination of…Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products (2001)Joint determination of produc…Integrated production maintenance and quality model for imperfect processes (1999)Integrated production mainten…An optimal production run length in deteriorating production processes (1999)An optimal production run len…Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections (1998)Optimal lot sizing and inspec…Quality control through lot sizing for items sold with warranty (1994)Quality control through lot s…JOINT DETERMINATION OF PRODUCTION QUANTITY, INSPECTION SCHEDULE, AND CONTROL CHART DESIGN (1994)JOINT DETERMINATION OF PRODUC…Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction (1986)Optimal Lot Sizing, Process Q…Economic Production Cycles with Imperfect Production Processes (1986)Inventory management and production planning and scheduling (1999)Scheduling and replenishment plan for an integrated deteriorating inventory model with stock-dependent selling rate (2006)Inventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investment (2011)Effect of inspection errors on imperfect production inventory model with warranty and price discount dependent demand rate (2019)Decision Systems for Inventory Management and Production Planning (1979)Production and inventory management (1983)An optimal production run time with imperfect production processes and allowable shortages (2002)Optimal batch sizing in a multi-stage production system with rework consideration (2006)An imperfect production process for time varying demand with inflation and time value of money – An EMQ model (2011)Japanese Manufacturing Techniques: Nine Hidden Lessons in Simplicity (1983)The impact of a free-repair warranty policy on EMQ model for imperfect production systems (2003)Extracting Maximum Value from Consumer Returns: Allocating Between Remarketing and Refurbishing for Warranty Claims (2016)What is the Right Supply Chain for Your Product (1997)Supply Chain Management: Strategy, Planning and Operations (2000)Arcs of integration: an international study of supply chain strategies (2001)Applying fuzzy linguistic quantifier to select supply chain partners at different phases of product life cycle (2005)Supplier selection in agile supply chains: An information-processing model and an illustration (2009)The impact of supply chain integration on responsiveness: The moderating effect of using an international supplier network (2012)Introduction to Statistical Quality Control (1992)Integrated production and quality model under various preventive maintenance policies (1998)Economic design of integrated model of control chart and maintenance management (2007)Journal of Industrial Engineering (2017)An EMQ model with inspections and random machine failures (1998)Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages (2006)Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return (2012)Perishable Inventory Theory: A Review (1982)An optimal batch size for an imperfect production system with quality assurance and rework (2006)A synergic economic order quantity model with trade credit, shortages, imperfect quality and inspection errors (2015)Total quality control (1961)Lot Sizing with Random Yields: A Review (1995)Economic production quantity model for items with imperfect quality (2000)Closed-Loop Supply Chain Models with Product Remanufacturing (2004)Simultaneous optimization of [Xbar] control chart and age-based preventive maintenance policies under an economic objective (2007)An economic manufacturing quantity model with probabilistic deterioration in a production system (2012)Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system (2013)
this work references cited by second hop

References

  • 1986Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction1,161 cited
  • 2003Supply chain management survey of Swedish manufacturing firms180 cited
  • 1999An optimal production run length in deteriorating production processes142 cited
  • 1994JOINT DETERMINATION OF PRODUCTION QUANTITY, INSPECTION SCHEDULE, AND CONTROL CHART DESIGN118 cited
  • 1999Integrated production maintenance and quality model for imperfect processes82 cited
  • 1994Quality control through lot sizing for items sold with warranty70 cited
  • 1998Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections67 cited
  • 2001Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products56 cited
  • 2001Simultaneous determination of the optimal production–inventory and product inspection policies for a deteriorating production system56 cited
  • 2003Optimal lot sizing for products sold under free-repair warranty54 cited
  • 2005Optimal lot size and inspection policy for products sold with warranty35 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work