SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Optimum Planning of Highway Construction under A + B Bidding Method
7 references·6 citing·30 second hop
Optimum Planning of Highway Construction under A + B Bidding Method (2001)Optimum Planning of Highway Construction …Optimizing Resource Utilization for Repetitive Construction Projects (2001)Optimizing Resource Utilizati…Resource-driven scheduling of repetitive activities (1998)Resource-driven scheduling of…Time Is Money: Innovative Contracting Methods in Highway Construction (1995)Time Is Money: Innovative Con…A+B Bidding Method—Hidden Success Story for Highway Construction (1995)A+B Bidding Method—Hidden Suc…Scheduling of Repetitive Projects with Cost Optimization (1993)Scheduling of Repetitive Proj…Simulation of Repetitive-Unit Construction (1980)Simulation of Repetitive-Unit…Construction Planning—Beyond the Critical Path (1980)Construction Planning—Beyond …Robust strategic bidding in auction-based markets (2018)Robust strategic bidding in a…Minimizing duration and crew work interruptions of repetitive construction projects (2018)Minimizing duration and crew …Project management quality and the value of flexible strategies (2006)Project management quality an…MACROS: Multiobjective Automated Construction Resource Optimization System (2006)MACROS: Multiobjective Automa…Time‐dependent construction social costs model (2005)Time‐dependent construction s…Parallel Computing Framework for Optimizing Construction Planning in Large-Scale Projects (2005)Parallel Computing Framework …Construction Resource Scheduling with Genetic Algorithms (1996)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Multiparameter Bidding System—Innovation in Contract Administration (1992)Incentive/Disincentive Contracts: Perceptions of Owners and Contractors (1998)Parallel Genetic Algorithms for Optimizing Resource Utilization in Large-Scale Construction Projects (2006)The use of time and cost utility for construction contract award under European Union Legislation (2006)Linear Scheduling Method for Highway Construction (1981)Line‐of‐Balance Scheduling in Pavement Construction (1986)RPM: Repetitive Project Modeling (1990)Work Continuity Constraints in Project Scheduling (2005)Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach (2008)Project Management with Dynamic Scheduling (2012)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)COUNTERSPECULATION, AUCTIONS, AND COMPETITIVE SEALED TENDERS (1961)Conditional value-at-risk for general loss distributions (2002)The Price of Robustness (2004)New Generation of Planning Structures (1993)Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling (2008)A Comparison of Buyer-Determined and Price-Based Multiattribute Mechanisms (2007)Court Efficiency and Procurement Performance (2017)Causes of schedule delays in construction projects in Algeria (2018)Resource-Activity Critical-Path Method for Construction Planning (2003)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution (2018)Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)Siren: A Repetitive Construction Simulation Model (1985)Resource‐Oriented Modeling and Simulation in Construction (1993)Model for Predicting the Performance of Project Managers at the Construction Phase of Mass House Building Projects (2008)
this work references cited by second hop

References

  • 2001Optimizing Resource Utilization for Repetitive Construction Projects161 cited
  • 1995Time Is Money: Innovative Contracting Methods in Highway Construction159 cited
  • 1980Construction Planning—Beyond the Critical Path123 cited
  • 1998Resource-driven scheduling of repetitive activities114 cited
  • 1993Scheduling of Repetitive Projects with Cost Optimization112 cited
  • 1995A+B Bidding Method—Hidden Success Story for Highway Construction85 cited
  • 1980Simulation of Repetitive-Unit Construction73 cited

Cited by

  • 2006MACROS: Multiobjective Automated Construction Resource Optimization System49 cited
  • 2018Robust strategic bidding in auction-based markets45 cited
  • 2005Parallel Computing Framework for Optimizing Construction Planning in Large-Scale Projects42 cited
  • 2005Time‐dependent construction social costs model41 cited
  • 2018Minimizing duration and crew work interruptions of repetitive construction projects40 cited
  • 2006Project management quality and the value of flexible strategies35 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work