Required characteristics of statistical distribution models for life cycle cost estimation
5 references·2 citing·27 second hop
Required characteristics of statistical distribution models for life cycle cost estimation (2003)Required characteristics of statistical d…The magical number seven, plus or minus two: Some limits on our capacity for processing information. (1994)The magical number seven, plu…Probabilistic Cost Estimating with Subjective Correlations (1993)Probabilistic Cost Estimating…Exceptional Paper—Probability Encoding in Decision Analysis (1975)Exceptional Paper—Probability…An approximate method for generating symmetric random variables (1972)An approximate method for gen…The magical number seven, plus or minus two: Some limits on our capacity for processing information. (1956)The magical number seven, plu…Uncertainties related to financial variables within infrastructure life cycle costing: a literature review (2017)Uncertainties related to fina…Selecting the best alternative based on life-cycle cost distributions of alternatives (2003)Selecting the best alternativ…Computer Simulation Techniques. (1967)Demand estimation in lost sales inventory systems (1994)Fourth-Moment Standardization for Structural Reliability Assessment (2007)A Social Network-Based Inference Model for Validating Customer Profile Data1 (2012)A design and implementation model for life cycle cost management system (1995)Life cycle costing—Theory, information acquisition and application (1997)Product life cycle cost analysis: State of the art review (1998)User-Oriented Model to Support Funding Decisions in Pavement Management (2009)Availability: A heuristic for judging frequency and probability (1973)On the psychology of prediction. (1973)Judgment under Uncertainty: Heuristics and Biases (1975)Norm theory: Comparing reality to its alternatives. (1986)Ambiguity and self-evaluation: The role of idiosyncratic trait definitions in self-serving assessments of ability. (1989)Uncertainties in risk analysis: Six levels of treatment (1996)A distribution-free approach to inducing rank correlation among input variables (1982)Simulation Modeling and Analysis. (1983)Uncertainty (1990)Simulation-based estimation for correlated cost elements (2005)Combination of Project Cost Forecasts in Earned Value Management (2011)An Overview of Budget Contingency Calculation Methods in Construction Industry (2014)EXPERIMENTAL PSYCHOLOGY (1940)Working Memory (1974)Application of a Technique for Research and Development Program Evaluation (1959)The life cycle costing (LCC) approach: a conceptual discussion of its usefulness for environmental decision-making (2004)A scaling method for priorities in hierarchical structures (1977)How to make a decision: The analytic hierarchy process (1990)The theory of planned behavior (1991)
this work references cited by second hop

References

  • 1956The magical number seven, plus or minus two: Some limits on our capacity for processing information.17,773 cited
  • 1994The magical number seven, plus or minus two: Some limits on our capacity for processing information.17,161 cited
  • 1975Exceptional Paper—Probability Encoding in Decision Analysis663 cited
  • 1972An approximate method for generating symmetric random variables398 cited
  • 1993Probabilistic Cost Estimating with Subjective Correlations95 cited

Cited by

  • 2017Uncertainties related to financial variables within infrastructure life cycle costing: a literature review21 cited
  • 2003Selecting the best alternative based on life-cycle cost distributions of alternatives18 cited