No open-access location is known for this record yet.
No open-access location is known for this record yet.
A CSP-C continuous sampling plan is a new single-level continuous sampling procedure developed by Govindaraju & Kandasamy (2000) by incorporating the concept of acceptance number to the CSP-1 plan for the application of continuous production processes. In this new plan, the sampling inspection phase is characterized by a maximum allowable number of non-conforming units, c, and a constant sampling rate, f. Govindaraju & Kandasamy (2000) derived the performance measures such as average outgoing quality (AOQ), average fraction inspected (AFI) etc, of the CSP-C plan using a Markov chain model for long run production processes. Yang (1983) has observed that the AOQ and AFI, being long run average measures, are not satisfactory measures of performance for short run production processes. Hence, formulas are derived in this paper, using the renewal theory approach enabling one to compute AOQ and AFI for both long run and short run production processes. Numerical illustrations are also given. By simulation, the accuracy of the short run measures is studied.
Loading…
Stored only when both papers are in the corpus — 10 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.