Float Consumption Impact on Cost and Schedule in the Construction Industry
7 references·1 citing·33 second hop
Float Consumption Impact on Cost and Schedule in the Construction Industry (2007)Float Consumption Impact on Cost and Sche…Probabilistic Forecasting of Project Performance Using Stochastic S Curves (2004)Probabilistic Forecasting of …Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration (2002)Multiple Simulation Analysis …Probabilistic Monitoring of Project Performance Using SS-Curves (2000)Probabilistic Monitoring of P…Comparison of Delay Analysis Methodologies (1998)Comparison of Delay Analysis …Modeling Project Performance for Decision Making (1996)Modeling Project Performance …Nondeterministic Networking Methods (1993)Nondeterministic Networking M…Analysis of Activity Networks under Uncertainty (1975)Analysis of Activity Networks…Time–Cost Optimization Model Considering Float-Consumption Impact (2015)Time–Cost Optimization Model …GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)Project Management: The Managerial Process (1999)Project management: the managerial process (2010)Initial experiments with the cross impact matrix method of forecasting (1968)Productivity management : planning, measurement and evaluation, control, and improvement (1985)Forecasting and Management of Technology (1991)Performance Modeling for Contractor Selection (2002)Practical Application for Integrated Performance Measurement of Construction Projects (2014)Risk-Based Project Delivery Selection Model for Highway Design and Construction (2015)CPM in construction management (1971)Narrow Reliability Bounds for Structural Systems (1979)Fuzzy Optimal Model for Resource-Constrained Construction Scheduling (1999)A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects (2015)A Bayesian-Driven Monte Carlo Approach for Managing Construction Schedule Risks of Infrastructures Under Uncertainty (2022)Professional Construction Management (1976)Precedence and Arrow Networking Techniques for Construction (1980)Construction Project Scheduling (1991)Process Model for Administrating Construction Claims (2002)Construction Delay Analysis Techniques—A Review of Application Issues and Improvement Needs (2013)Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol (2018)Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders (1989)Cost‐ and Schedule‐Control Integration: Issues and Needs (1991)Forecasting methods for management (1990)Project Management for Engineering and Construction (1993)Project cash flow analysis in the presence of uncertainty in activity duration and cost (2011)A new approach for project control under uncertainty. Going back to the basics (2013)System Dynamics Approach for Forecasting Performance of Construction Projects (2017)Probabilistic Forecasting of Project Duration Using Bayesian Inference and the Beta Distribution (2009)Probabilistic Forecasting of Project Duration Using Kalman Filter and the Earned Value Method (2010)A comparative study of Artificial Intelligence methods for project duration forecasting (2015)Project duration in stochastic networks by the PERT-path technique (2000)Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model (2007)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)
this work references cited by second hop

References

  • 2004Probabilistic Forecasting of Project Performance Using Stochastic S Curves152 cited
  • 1998Comparison of Delay Analysis Methodologies122 cited
  • 2000Probabilistic Monitoring of Project Performance Using SS-Curves106 cited
  • 1975Analysis of Activity Networks under Uncertainty105 cited
  • 1996Modeling Project Performance for Decision Making79 cited
  • 1993Nondeterministic Networking Methods59 cited
  • 2002Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration57 cited

Cited by

  • 2015Time–Cost Optimization Model Considering Float-Consumption Impact48 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work