SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Predicting the maintenance cost of construction equipment: Comparison between general regression neural network and Box–Jenkins time series models
6 references·5 citing·40 second hop
Predicting the maintenance cost of construction equipment: Comparison between general regression neural network and Box–Jenkins time series models (2013)Predicting the maintenance cost of constr…Artificial neural networks for non-stationary time series (2004)Artificial neural networks fo…Time-Series Forecasting (2002)Time-Series ForecastingTime-Series Forecasting (2000)Time-Series ForecastingNumerical distribution functions for unit root and cointegration tests (1996)Numerical distribution functi…Distribution of the Estimators for Autoregressive Time Series with a Unit Root (1979)Distribution of the Estimator…Time Series Analysis: Forecasting and Control (1977)Time Series Analysis: Forecas…Improving Accuracy in Predicting City-Level Construction Cost Indices by Combining Linear ARIMA and Nonlinear ANNs (2021)Improving Accuracy in Predict…Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling (2020)Data-Driven Machine Learning …Modelling Construction Site Cost Index Based on Neural Network Ensembles (2019)Modelling Construction Site C…Prediction of site overhead costs with the use of artificial neural network based model (2018)Prediction of site overhead c…Artificial Neural Networks for Construction Management: A Review (2017)Artificial Neural Networks fo…A Monetary History of the United States 1867-1960 (1964)Time Series Analysis Forecasting and Control. (1971)Statistical analysis of cointegration vectors (1988)Bounds testing approaches to the analysis of level relationships (2001)Co-Integration and Error Correction: Representation, Estimation, and Testing (1987)Testing for a Unit Root in Time Series Regression (1988)Numerical distribution functions of likelihood ratio tests for cointegration (1999)Unit root tests for panel data (2001)Critical Values for Cointegration Tests (2010)Time series forecasting using a hybrid ARIMA and neural network model (2003)An early warning system for detection of financial crisis using financial market volatility (2006)Financial Time Series Prediction Using Spiking Neural Networks (2014)Integrating principle component analysis and weighted support vector machine for stock trading signals prediction (2018)Neural Network Model for Parametric Cost Estimation of Highway Projects (1998)Neural Network Modeling of Highway Construction Costs (2005)Application of a PSO-based neural network in analysis of outcomes of construction claims (2007)Risk Assessment of Additional Works in Railway Construction Investments Using the Bayes Network (2019)Prediction of simulated cost contingency for steel reinforcement in building projects: ANN versus regression-based models (2020)Predicting Accuracy of Early Cost Estimates Using Factor Analysis and Multivariate Regression (2003)Sustainable Decision-Making in Civil Engineering, Construction and Building Technology (2017)Improving the Results of the Earned Value Management Technique Using Artificial Neural Networks in Construction Projects (2020)Data mining with big data (2013)Does infrastructure investment lead to economic growth or economic fragility? Evidence from China (2016)Machine Learning Algorithms for Construction Projects Delay Risk Prediction (2019)Automated Identification of Substantial Changes in Construction Projects of Airport Improvement Program: Machine Learning and Natural Language Processing Comparative Analysis (2021)Applying Machine Learning and Particle Swarm Optimization for predictive modeling and cost optimization in construction project management (2023)Leveraging Artificial Intelligence in Project Management: A Systematic Review of Applications, Challenges, and Future Directions (2025)Tests of Conditional Predictive Ability (2006)A novel hybridization of artificial neural networks and ARIMA models for time series forecasting (2010)Characterizing relationship between demand surge and post-disaster reconstruction capacity considering poverty rates (2022)Performance Analysis of Construction Cost Prediction Using Neural Network for Multioutput Regression (2022)Construction cost prediction system based on Random Forest optimized by the Bird Swarm Algorithm (2023)Prediction Intervals for Time-Series Forecasting (2001)Time-Series Forecasting (2005)Forecast Combinations in a DSGE‐VAR Lab (2016)Forecasting Daily Patient Volumes in the Emergency Department (2008)Forecasting Time Series With Complex Seasonal Patterns Using Exponential Smoothing (2011)A Survey of Forecast Error Measures (2013)Likelihood Ratio Statistics for Autoregressive Time Series with a Unit Root (1981)Generalized autoregressive conditional heteroskedasticity (1986)
this work references cited by second hop

References

  • 1979Distribution of the Estimators for Autoregressive Time Series with a Unit Root23,183 cited
  • 1977Time Series Analysis: Forecasting and Control19,200 cited
  • 1996Numerical distribution functions for unit root and cointegration tests3,119 cited
  • 2000Time-Series Forecasting1,053 cited
  • 2002Time-Series Forecasting107 cited
  • 2004Artificial neural networks for non-stationary time series94 cited

Cited by

  • 2021Improving Accuracy in Predicting City-Level Construction Cost Indices by Combining Linear ARIMA and Nonlinear ANNs65 cited
  • 2020Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling63 cited
  • 2018Prediction of site overhead costs with the use of artificial neural network based model59 cited
  • 2019Modelling Construction Site Cost Index Based on Neural Network Ensembles48 cited
  • 2017Artificial Neural Networks for Construction Management: A Review46 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work