SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
On the hardness of evaluating criticality of activities in a planar network with duration intervals
4 references·1 citing·17 second hop
On the hardness of evaluating criticality of activities in a planar network with duration intervals (2002)On the hardness of evaluating criticality…The computational complexity of the criticality problems in a network with interval activity times (2002)The computational complexity …Critical path analysis in the network with fuzzy activity times (2001)Critical path analysis in the…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…Critical-path planning and scheduling (1959)Critical-path planning and sc…Criticality analysis of activity networks under interval uncertainty (2010)Criticality analysis of activ…Application of a Technique for Research and Development Program Evaluation (1959)The use of fuzzy variables in pert (1981)On the sure criticality of tasks in activity networks with imprecise durations (2002)On computing the latest starting times and floats of activities in a network with imprecise durations (2004)Where Do We Stand with Fuzzy Project Scheduling? (2004)Fuzzy Sets and Systems - Theory and Applications (1980)PSPLIB - A project scheduling problem library (1997)Robust Discrete Optimization and Its Applications (1997)Construction schedule risk analysis – a hybrid machine learning approach (2022)Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project (2012)A model of resilient supply chain network design: A two-stage programming with fuzzy shortest path (2013)Are complexity and uncertainty distinct concepts in project management? A taxonomical examination from literature (2016)HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)Time, cost and quality trade-off in project management: a case study (1999)When neighboring disciplines fail to learn from each other: The case of innovation and project management research (2018)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)An integrated survey of deterministic project scheduling (2001)
this work references cited by second hop

References

  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1959Critical-path planning and scheduling623 cited
  • 2001Critical path analysis in the network with fuzzy activity times236 cited
  • 2002The computational complexity of the criticality problems in a network with interval activity times85 cited

Cited by

  • 2010Criticality analysis of activity networks under interval uncertainty39 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work