SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A Better Way to Estimate and Mitigate Disruption
4 references·4 citing·28 second hop
A Better Way to Estimate and Mitigate Disruption (1998)A Better Way to Estimate and Mitigate Dis…Construction Planning and Scheduling (1997)Construction Planning and Sch…Quantitative Effects of Construction Changes on Labor Productivity (1995)Quantitative Effects of Const…Impact of change orders on construction productivity (1991)Impact of change orders on co…Construction Productivity Improvement (1987)Construction Productivity Imp…Critical construction conflicting factors identification using analytical hierarchy process (2006)Critical construction conflic…Avoiding Change Orders in Public School Construction (2006)Avoiding Change Orders in Pub…Method for Calculating Schedule Delay Considering Lost Productivity (2005)Method for Calculating Schedu…Cost Impacts, Scheduling Impacts, and the Claims Process during Construction (2004)Cost Impacts, Scheduling Impa…Concurrent Delays in Construction Projects (1987)Construction Delay Claims (1987)Construction Contractors' Claim Process Framework (2001)Review of Delay Analysis Methods: A Process-Based Comparison (2009)An ontology-based approach for delay analysis in construction (2017)Professional Construction Management (1976)Construction Project Administration (1978)Budgeting Owner’s Construction Contingency (2007)Effects of Change Orders on Cost Growth, Schedule Growth, and Construction Intensity of Large Highway Projects (2018)Impacts of Change Orders on Cost and Schedule Performance and the Correlation with Project Size of DB Building Projects (2019)Modeling Construction Labor Productivity (1990)Labor Productivity Drivers and Opportunities in the Construction Industry (2003)Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore (2016)Factors influencing labor productivity on construction sites (2016)Analytical hierarchy process (1994)Critical Success Factors for Different Project Objectives (1999)Factors Affecting the Success of a Construction Project (2004)Impact of Change Orders on Labor Efficiency for Electrical Construction (1999)A process reference model for claims management in construction supply chains: the contractors’ perspective (2018)Dynamic networks for resilience-driven management of infrastructure projects (2022)Statistical-Fuzzy Approach to Quantify Cumulative Impact of Change Orders (2002)PREDICTING PRODUCTIVITY LOSS CAUSED BY CHANGE ORDERS USING THE EVOLUTIONARY FUZZY SUPPORT VECTOR MACHINE INFERENCE MODEL (2015)Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources (2008)Improving construction workflow- The role of production planning and control (2009)Motivational Factors Impacting the Productivity of Construction Master Craftsmen in Kuwait (2012)Interaction between Subcycles: One Key to Improved Methods (1993)Model for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction (2010)Factors influencing labour productivity in Bahrain's construction industry (2015)
this work references cited by second hop

References

  • 1995Quantitative Effects of Construction Changes on Labor Productivity191 cited
  • 1987Construction Productivity Improvement148 cited
  • 1997Construction Planning and Scheduling106 cited
  • 1991Impact of change orders on construction productivity62 cited

Cited by

  • 2006Avoiding Change Orders in Public School Construction53 cited
  • 2004Cost Impacts, Scheduling Impacts, and the Claims Process during Construction53 cited
  • 2005Method for Calculating Schedule Delay Considering Lost Productivity40 cited
  • 2006Critical construction conflicting factors identification using analytical hierarchy process33 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work