SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A GA-based fuzzy optimal model for construction time–cost trade-off
7 references·16 citing·40 second hop
A GA-based fuzzy optimal model for construction time–cost trade-off (2001)A GA-based fuzzy optimal model for constr…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…Fuzzy sets (1996)Fuzzy setsResource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Resource-Constrained Project …The use of fuzzy variables in pert (1981)The use of fuzzy variables in…A Simple CPM Time-Cost Tradeoff Algorithm (1971)A Simple CPM Time-Cost Tradeo…Fuzzy sets (1965)Fuzzy setsCritical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm (2021)Tradeoff time cost quality in…Multi-objective optimization for repetitive scheduling under uncertainty (2019)Multi-objective optimization …Project crashing using a fuzzy multi-objective model considering time, cost, quality and risk under fast tracking technique: A case study (2018)Project crashing using a fuzz…Six decades of project management research: Thematic trends and future opportunities (2016)Six decades of project manage…Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects (2013)Fuzzy Assessment Model to Est…Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project (2012)Discrete time–cost–environmen…Time–cost trade-off analysis of project networks in fuzzy environments (2011)Time–cost trade-off analysis …Stochastic time–cost optimization using non-dominated archiving ant colony approach (2011)Stochastic time–cost optimiza…Overview of the Application of “Fuzzy Techniques” in Construction Management Research (2009)Overview of the Application o…Fuzzy-based MOGA approach to stochastic time–cost trade-off problem (2009)Fuzzy-based MOGA approach to …Time–cost optimization: using GA and fuzzy sets theory for uncertainties in cost (2008)Time–cost optimization: using…Optimisation of construction site layout using a hybrid simulation-based system (2008)Optimisation of construction …A two-phase GA model for resource-constrained project scheduling (2008)A two-phase GA model for reso…The stochastic time–cost tradeoff problem: A robust optimization approach (2006)The stochastic time–cost trad…Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front (2005)Stochastic Time–Cost Optimiza…Bid/no-bid decision-making – a fuzzy linguistic approach (2004)Bid/no-bid decision-making – …Application of a Technique for Research and Development Program Evaluation (1959)An Analytical Study of the PERT Assumptions (1964)Fuzzy set theory applications in production management research: a literature survey (1998)Critical path analysis in the network with fuzzy activity times (2001)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Critical-Path Planning and Scheduling (1959)A Network Flow Computation for Project Cost Curves (1961)Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method (1995)Time, cost and quality trade-off in project management: a case study (1999)Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in construction (2010)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Activity networks: Project planning and control by network models (1977)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A survey on the resource-constrained project scheduling problem (1995)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)Practical Meta-Analysis (2000)APPLICATION OF DELPHI METHOD IN CONSTRUCTION ENGINEERING AND MANAGEMENT RESEARCH: A QUANTITATIVE PERSPECTIVE (2016)Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects (2017)A review of artificial intelligence based risk assessment methods for capturing complexity-risk interdependencies (2019)The magical number seven, plus or minus two: Some limits on our capacity for processing information. (1956)Multiple Attribute Decision Making: Methods and Applications (1981)The magical number seven, plus or minus two: Some limits on our capacity for processing information. (1994)A novel two-phase group decision making approach for construction project selection in a fuzzy environment (2011)Analyzing the Past to Prepare for the Future: Writing a Literature Review (2002)Content Analysis in Mass Communication: Assessment and Reporting of Intercoder Reliability (2002)A guide to the project management body of knowledge (PMBOK guide) (2004)Complexity, uncertainty and mental models: From a paradigm of regulation to a paradigm of emergence in project management (2017)A classification and review of approaches and methods for modeling uncertainty in projects (2019)Sustainable Project Management: Trends and Alignment (2020)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Critical-path planning and scheduling (1959)An integrated survey of deterministic project scheduling (2001)Extensions of the TOPSIS for group decision-making under fuzzy environment (2000)An approach for detecting, quantifying, and visualizing the evolution of a research field: A practical application to the Fuzzy Sets Theory field (2010)Science mapping software tools: Review, analysis, and cooperative study among tools (2011)Family resemblances: Studies in the internal structure of categories (1975)Basic objects in natural categories (1976)Soft set theory—First results (1999)
this work references cited by second hop

References

  • 1965Fuzzy sets67,827 cited
  • 1996Fuzzy sets46,880 cited
  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 1982Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case456 cited
  • 1981The use of fuzzy variables in pert238 cited
  • 1971A Simple CPM Time-Cost Tradeoff Algorithm223 cited

Cited by

  • 2004Bid/no-bid decision-making – a fuzzy linguistic approach182 cited
  • 2016Six decades of project management research: Thematic trends and future opportunities182 cited
  • 2009Overview of the Application of “Fuzzy Techniques” in Construction Management Research179 cited
  • 2013Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects126 cited
  • 2008A two-phase GA model for resource-constrained project scheduling124 cited
  • 2012Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II Hydroelectric Project122 cited
  • 2009Fuzzy-based MOGA approach to stochastic time–cost trade-off problem106 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2005
Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front
96 cited
  • 2011Stochastic time–cost optimization using non-dominated archiving ant colony approach73 cited
  • 2008Time–cost optimization: using GA and fuzzy sets theory for uncertainties in cost71 cited
  • 2011Time–cost trade-off analysis of project networks in fuzzy environments66 cited
  • 2008Optimisation of construction site layout using a hybrid simulation-based system59 cited
  • 2006The stochastic time–cost tradeoff problem: A robust optimization approach57 cited
  • 2018Project crashing using a fuzzy multi-objective model considering time, cost, quality and risk under fast tracking technique: A case study55 cited
  • 2021Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm54 cited
  • 2019Multi-objective optimization for repetitive scheduling under uncertainty54 cited