SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Window Analyses of Compensable Delays
0 references·7 citing·28 second hop
Window Analyses of Compensable Delays (1999)Window Analyses of Compensable DelaysDelay factors in construction of healthcare infrastructure projects: a comparison amongst developing countries (2020)Delay factors in construction…Understanding Construction Delay Analysis and the Role of Preconstruction Programming (2013)Understanding Construction De…Analysis Methods in Time-Based Claims (2008)Analysis Methods in Time-Base…Schedule Analysis under the Effect of Resource Allocation (2007)Schedule Analysis under the E…Construction Delay Analysis under Multiple Baseline Updates (2007)Construction Delay Analysis u…An integrated decision support system for dealing with time extension entitlements (2007)An integrated decision suppor…Method for Calculating Schedule Delay Considering Lost Productivity (2005)Method for Calculating Schedu…Concurrent Delays in Construction Projects (1987)Construction Delay Claims (1987)Construction Contractors' Claim Process Framework (2001)Review of Delay Analysis Methods: A Process-Based Comparison (2009)An ontology-based approach for delay analysis in construction (2017)Research Design: Qualitative, Quantitative, and Mixed Methods Approaches (1994)Qualitative Research for Education: An Introduction to Theory and Methods (1997)Research design: qualitative, quantitative, and mixed methods approaches (2003)Administering Extension of Time under National and International Standard Forms of Contracts: A Contractor’s Perspective (2016)Decision-Making Model for Selecting the Optimum Method of Delay Analysis in Construction Projects (2016)A meta-analysis of critical causes of project delay using Spearman’s rank and relative importance index integrated approach (2020)Construction delay analysis techniques (1996)Comparison of Delay Analysis Methodologies (1998)Application of a PSO-based neural network in analysis of outcomes of construction claims (2007)Issues Associated with Extension of Time (EoT) Claim in Malaysian Construction Industry (2013)Building construction cost data (1943)Selecting a delay analysis method in resolving construction claims (2005)Hybrid fuzzy-system dynamics approach for quantification of the impacts of construction claims (2019)A Heuristic Model for Scheduling Large Projects with Limited Resources (1967)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Delay Analysis under Multiple Baseline Updates (2008)Risk Propagation Model and Simulation of Schedule Change in Construction Projects: A Complex Network Approach (2020)Construction delay: a quantitative analysis (2000)Causes of delay in large construction projects (2006)Significant factors causing delay in the UAE construction industry (2006)Reliability in Content Analysis. (2004)Causes and effects of delays in Malaysian construction industry (2007)Moderating Effect of Senior Management Support on the Relationship Between Schedule Delay Factors and Project Performance (2021)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2008Analysis Methods in Time-Based Claims50 cited
  • 2007Schedule Analysis under the Effect of Resource Allocation48 cited
  • 2013Understanding Construction Delay Analysis and the Role of Preconstruction Programming47 cited
  • 2005Method for Calculating Schedule Delay Considering Lost Productivity40 cited
  • 2007An integrated decision support system for dealing with time extension entitlements34 cited
  • 2020Delay factors in construction of healthcare infrastructure projects: a comparison amongst developing countries32 cited
  • 2007Construction Delay Analysis under Multiple Baseline Updates31 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work