SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Resource-constrained project scheduling by simulated annealing
14 references·16 citing·25 second hop
Resource-constrained project scheduling by simulated annealing (1996)Resource-constrained project scheduling b…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Branch-and-Bound Procedure …Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Some efficient multi-heuristi…HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)HEURISTIC ALGORITHMS FOR RESO…Project scheduling with resource constraints: A branch and bound approach (1987)Project scheduling with resou…A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A Comparison of Exact Approac…Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Resource-Constrained Project …Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)Multi-Project Scheduling: Cat…Multiple Resource–Constrained Scheduling Using Branch and Bound (1978)Multiple Resource–Constrained…An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems (1978)An Efficient Integer Programm…Activity networks: Project planning and control by network models (1977)Activity networks: Project pl…Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation (1976)Heuristics for Scheduling Res…A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)A Comparison of Heuristic and…Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Project Scheduling under Reso…Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Multiproject Scheduling with …Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm (2019)Solving Resource-Constrained …An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case (2017)An efficient genetic algorith…On the performance of bee algorithms for resource-constrained project scheduling problem (2011)On the performance of bee alg…Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (2011)Multi-mode resource-constrain…Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (2010)Using resource scarceness cha…A Neurogenetic approach for the resource-constrained project scheduling problem (2010)A Neurogenetic approach for t…A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem (2010)A biased random-key genetic a…Project scheduling with limited resources using a genetic algorithm (2009)Project scheduling with limit…A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (2009)A hybrid rank-based evolution…A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem (2007)A multi‐agent system for the …Multi-mode resource constrained project scheduling: scheduling schemes, priority rules and mode selection rules. (2006)Multi-mode resource constrain…Multimode Project Scheduling Based on Particle Swarm Optimization (2005)Multimode Project Scheduling …A hybrid metaheuristic for the resource-constrained project scheduling problem (2005)A hybrid metaheuristic for th…The multi-mode resource-constrained project scheduling problem with generalized precedence relations (1999)The multi-mode resource-const…Tabu Search Algorithms and Lower Bounds for the Resource-Constrained Project Scheduling Problem (1999)Tabu Search Algorithms and Lo…A heuristic for network project scheduling with random activity durations depending on the resource allocation (1998)A heuristic for network proje…Application of a Technique for Research and Development Program Evaluation (1959)Efficient priority rules for the resource‐constrained project scheduling problem (1996)Robust and reactive project scheduling: a review and classification of procedures (2004)An Efficient Branch and Bound Algorithm for the Warehouse Location Problem (1972)An Efficient Branch and Bound Algorithm for the Capacitated Warehouse Location Problem (1977)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm (1998)Resource-constrained project scheduling: A survey of recent developments (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)An integrated survey of deterministic project scheduling (2001)A competitive genetic algorithm for resource-constrained project scheduling (1998)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)A survey on the resource-constrained project scheduling problem (1995)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation (1998)New Benchmark Results for the Resource-Constrained Project Scheduling Problem (1997)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Project Scheduling—Theory and Practice (2005)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)
this work references cited by second hop

References

  • 1969Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach773 cited
  • 1992A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem606 cited
  • 1977Activity networks: Project planning and control by network models575 cited
  • 1982Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case456 cited
  • 1975A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling454 cited
  • 1987Project scheduling with resource constraints: A branch and bound approach377 cited
  • 1984A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem341 cited
  • 1982Multi-Project Scheduling: Categorization of Heuristic Rules Performance289 cited
  • 1990Some efficient multi-heuristic procedures for resource-constrained project scheduling261 cited
  • 1978Multiple Resource–Constrained Scheduling Using Branch and Bound250 cited
  • 1973Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures211 cited
  • 1978An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems209 cited
  • 1989HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS195 cited
  • 1976

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
174 cited

Cited by

  • 2017An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case169 cited
  • 1999The multi-mode resource-constrained project scheduling problem with generalized precedence relations149 cited
  • 2011Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers132 cited
  • 2011On the performance of bee algorithms for resource-constrained project scheduling problem129 cited
  • 2005Multimode Project Scheduling Based on Particle Swarm Optimization123 cited
  • 2010A Neurogenetic approach for the resource-constrained project scheduling problem120 cited
  • 2007A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem114 cited
  • 1999Tabu Search Algorithms and Lower Bounds for the Resource-Constrained Project Scheduling Problem100 cited
  • 2005A hybrid metaheuristic for the resource-constrained project scheduling problem99 cited
  • 2009A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem96 cited
  • 2010A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem93 cited
  • 2019Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm78 cited
  • 1998A heuristic for network project scheduling with random activity durations depending on the resource allocation76 cited
  • 2006Multi-mode resource constrained project scheduling: scheduling schemes, priority rules and mode selection rules.73 cited
  • 2010Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem66 cited
  • 2009Project scheduling with limited resources using a genetic algorithm60 cited