Formal Development of Line‐of‐Balance Technique
3 references·16 citing·35 second hop
Formal Development of Line‐of‐Balance Technique (1990)Formal Development of Line‐of‐Balance Tec…Line‐of‐Balance Scheduling in Pavement Construction (1986)Line‐of‐Balance Scheduling in…VPM Scheduling for High-Rise Buildings (1975)VPM Scheduling for High-Rise …Planning Construction of Repetitive Building Units (1974)Planning Construction of Repe…Strengths and shortcomings of methodologies for production planning and control of construction projects: a systematic literature review and future perspectives (2020)Strengths and shortcomings of…Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle East (2017)Coordination Challenges of Pr…Repetitive Scheduling Method: Requirements, Modeling, and Implementation (2016)Repetitive Scheduling Method:…Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions (2016)Linear scheduling with multip…Automated progress monitoring system for linear infrastructure projects using satellite remote sensing (2016)Automated progress monitoring…CPM/LOB Scheduling Method for Project Deadline Constraint Satisfaction (2014)CPM/LOB Scheduling Method for…Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling (2013)Challenges and opportunities …Float Types in Linear Schedule Analysis with Singularity Functions (2009)Float Types in Linear Schedul…Genetic algorithm-based multi-objective model for scheduling of linear construction projects (2008)Genetic algorithm-based multi…Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling (2004)Critical path determination b…Comparison of Linear Scheduling Model and Repetitive Scheduling Method (2003)Comparison of Linear Scheduli…Simulation-Based Scheduling with Continuous Activity Relationships (1998)Simulation-Based Scheduling w…Linear scheduling: past research efforts and future directions (1998)Linear scheduling: past resea…Controlling activity interval times in LOB scheduling (1998)Controlling activity interval…Dynamic Programming Approach to Scheduling of Nonserial Linear Project (1996)Dynamic Programming Approach …Effective construction planning (1994)Effective construction planni…RPM: Repetitive Project Modeling (1990)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Multi-objective optimization model for multi-project scheduling on critical chain (2013)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation (2018)Linear Scheduling Method for Highway Construction (1981)Resource-driven scheduling of repetitive activities (1998)Effect of learning on line-of-balance scheduling (2001)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Modern Construction Management (2012)Professional Construction Management (1976)Project Management With Cpm, Pert and Precedence Diagramming (1983)Planning and analysis of construction operations (1992)Optimization model for resource assignment problems of linear construction projects (2006)Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions (2009)Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)Linear Scheduling Model: Development of Controlling Activity Path (1998)Scheduling Projects with Repeating Activities (1998)Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT) (2018)A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic (2019)Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Space-Time Repetitive Project Scheduling Considering Location and Congestion (2018)Enhanced Repetitive-Scheduling Computation and Visualization (2020)Construction Planning for Linear Projects (1980)Application of Linear Scheduling (1986)THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL (2000)A guide to the project management body of knowledge (PMBOK guide) (2004)The SAGE handbook of organizational research methods (2009)Project-focussed literature on public-private partnership (PPP) in developing countries: a critical review (2022)Siren: A Repetitive Construction Simulation Model (1985)HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects (1994)Work Continuity Constraints in Project Scheduling (2005)Optimizing linear project scheduling with multi-skilled crews (2012)Resource Leveling Based on Line of Balance and Constraint Programming (2018)MULTI-OBJECTIVE SYMBIOTIC ORGANISMS OPTIMIZATION FOR MAKING TIME-COST TRADEOFFS IN REPETITIVE PROJECT SCHEDULING PROBLEM (2019)
this work references cited by second hop

References

  • 1986Line‐of‐Balance Scheduling in Pavement Construction148 cited
  • 1975VPM Scheduling for High-Rise Buildings107 cited
  • 1974Planning Construction of Repetitive Building Units101 cited

Cited by

  • 2003Comparison of Linear Scheduling Model and Repetitive Scheduling Method83 cited
  • 2008Genetic algorithm-based multi-objective model for scheduling of linear construction projects78 cited
  • 2016Automated progress monitoring system for linear infrastructure projects using satellite remote sensing61 cited
  • 2014CPM/LOB Scheduling Method for Project Deadline Constraint Satisfaction58 cited
  • 2020Strengths and shortcomings of methodologies for production planning and control of construction projects: a systematic literature review and future perspectives57 cited
  • 2016Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions54 cited
  • 2016Repetitive Scheduling Method: Requirements, Modeling, and Implementation52 cited
  • 2004Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling51 cited
  • 2013Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling48 cited
  • 1994Effective construction planning48 cited
  • 1996

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Dynamic Programming Approach to Scheduling of Nonserial Linear Project
47 cited
  • 1998Linear scheduling: past research efforts and future directions42 cited
  • 2017Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle East38 cited
  • 1998Simulation-Based Scheduling with Continuous Activity Relationships36 cited
  • 1998Controlling activity interval times in LOB scheduling36 cited
  • 2009Float Types in Linear Schedule Analysis with Singularity Functions35 cited