SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A new earthworks estimating methodology
4 references·1 citing·17 second hop
A new earthworks estimating methodology (2000)A new earthworks estimating methodologyVisual Interactive Fitting of Beta Distributions (1991)Visual Interactive Fitting of…Review: D.G. Carmichael Engineering Queues in Construction and Mining, Ellis Horwood Ltd (1987)Review: D.G. Carmichael Engin…Engineering queues in construction and mining (1987)Engineering queues in constru…Cyclone–Method for Modeling Job Site Processes (1977)Cyclone–Method for Modeling J…Productivity estimation of bulldozers using generalized linear mixed models (2014)Productivity estimation of bu…Estimating Construction Productivity: Neural‐Network‐Based Approach (1994)Earthmoving Productivity Estimation Using Linear Regression Techniques (1999)Construction equipment productivity estimation using artificial neural network model (2006)Audio-Based Bayesian Model for Productivity Estimation of Cyclic Construction Activities (2019)Advancing equipment management for construction: introducing a new model for cost, time and quality optimization (2025)An Analytical Study of the PERT Assumptions (1964)A progress report on the training of probability assessors (1982)Calibration of probabilities: The state of the art to 1980 (1982)Monte Carlo simulation of construction costs using subjective data (1995)Using Univariate Bézier Distributions to Model Simulation Input Processes (1996)Probability Distribution Functions for Construction Simulation (2000)General-Purpose Systems for Effective Construction Simulation (1999)Simphony (1999)Role of Simulation in Construction Engineering and Management (2010)Finite-Source Queueing Systems and their Applications (2001)An Alternative Approach to Capital Investment Appraisal (2011)Chapter 10 Queueing theory (1990)
this work references cited by second hop

References

  • 1977Cyclone–Method for Modeling Job Site Processes353 cited
  • 1991Visual Interactive Fitting of Beta Distributions98 cited
  • 1987Engineering queues in construction and mining33 cited
  • 1987Review: D.G. Carmichael Engineering Queues in Construction and Mining, Ellis Horwood Ltd29 cited

Cited by

  • 2014Productivity estimation of bulldozers using generalized linear mixed models55 cited