Construction rescheduling based on a manufacturing rescheduling framework
7 references·0 citing·34 second hop
Construction rescheduling based on a manufacturing rescheduling framework (2009)Construction rescheduling based on a manu…Genetic Optimization for Dynamic Project Control (2003)Genetic Optimization for Dyna…Constraint-Based Planning with Integrated Production Scheduler over Internet (2003)Constraint-Based Planning wit…Understanding Activity Scheduling and Rescheduling Behaviour: Theory and Numerical Illustration (2001)Understanding Activity Schedu…Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Resource-constrained project …GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)GA-Based Multicriteria Optima…Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project …What is this thing called theory of constraints and how should it be implemented (1990)What is this thing called the…On the Determination of Social Action in Space and Time (1983)Computational-process modelling of household activity scheduling (1994)A computerized household activity scheduling survey (2000)Changing the timing of activities in resolving Scheduling Conflicts (2006)MEASURING AND PREDICTING ADAPTATION BEHAVIOR IN MULTIDIMENSIONAL ACTIVITY-TRAVEL PATTERNS (2006)A multi-objective approach to scheduling joint participation with variable space and time preferences and opportunities (2010)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)PSPLIB - A project scheduling problem library (1997)Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)An integrated survey of deterministic project scheduling (2001)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)Shielding Production: Essential Step in Production Control (1998)The production performance benefits from JIT implementation (2000)Impact of soft logic on the probabilistic duration of construction projects (2005)Key Constraints Analysis with Integrated Production Scheduler (2005)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Multiple Attribute Decision Making (1981)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)Construction Resource Scheduling with Genetic Algorithms (1996)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Critical Chain Project Management Improves Project Performance (1999)Optimisation of construction site layout using a hybrid simulation-based system (2008)Overlapping design and construction activities and an optimization approach to minimize rework (2013)MOSCOPEA: Multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm (2016)Theory of constraints (1998)Critical chain: the theory of constraints applied to project management (2000)A review of production planning and control: the applicability of key concepts to the make-to-order industry (2005)Ant colony optimization for resource-constrained project scheduling (2002)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)
this work references cited by second hop

References

  • 1999Resource-constrained project scheduling: Notation, classification, models, and methods1,501 cited
  • 1998Resource-constrained project scheduling: A survey of recent developments562 cited
  • 1990What is this thing called theory of constraints and how should it be implemented488 cited
  • 1999GA-Based Multicriteria Optimal Model for Construction Scheduling232 cited
  • 2003Genetic Optimization for Dynamic Project Control70 cited
  • 2001Understanding Activity Scheduling and Rescheduling Behaviour: Theory and Numerical Illustration42 cited
  • 2003Constraint-Based Planning with Integrated Production Scheduler over Internet42 cited