Postgraduate research students' satisfaction in University Technology Malaysia
8 references·16 citing·35 second hop
Postgraduate research students' satisfaction in University Technology Malaysia (2010)Postgraduate research students' satisfact…Delays and cost overruns in the construction projects in the Gaza Strip (2009)Delays and cost overruns in t…Cost escalation and schedule delays in road construction projects in Zambia (2008)Cost escalation and schedule …Delays and cost increases in the construction of private residential projects in Kuwait (2005)Delays and cost increases in …World Bank Operations Evaluation Department (2003)World Bank Operations Evaluat…Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Causes of delay and cost over…Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Factors influencing construct…Causes of High Costs of Construction in Nigeria (1988)Causes of High Costs of Const…The Anatomy of Major Projects (1987)The Anatomy of Major ProjectsReview of construction journals on causes of project cost overruns (2020)Review of construction journa…Linking transformational leadership and “multi-dimensions” of project success (2019)Linking transformational lead…Identifying and Measuring Engineering, Procurement, and Construction (EPC) Key Performance Indicators and Management Strategies (2019)Identifying and Measuring Eng…Phase-based analysis of key cost and schedule performance causes and preventive strategies (2018)Phase-based analysis of key c…Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong (2018)Measurement and Dependence An…Engineering, Procurement, and Construction Cost and Schedule Performance Leading Indicators: State-of-the-Art Review (2018)Engineering, Procurement, and…Toward a Systemic View to Cost Overrun Causation in Infrastructure Projects: A Review and Implications for Research (2017)Toward a Systemic View to Cos…Critical factors affecting schedule performance (2017)Critical factors affecting sc…COST OVERRUN IN CONSTRUCTION PROJECTS IN DEVELOPING COUNTRIES, GAS-OIL INDUSTRY OF IRAN AS A CASE STUDY (2016)COST OVERRUN IN CONSTRUCTION …Modeling Causes of Cost Overrun in Large Construction Projects with Partial Least Square-SEM Approach: Contractor's Perspective (2013)Modeling Causes of Cost Overr…Controlling Cost Overrun Factors in Construction Projects in Malaysia (2013)Controlling Cost Overrun Fact…Analysis of Cost Overrun Factors for Small Scale Construction Projects in Malaysia Using PLS-SEM Method (2013)Analysis of Cost Overrun Fact…Relationship between Factors of Construction Resources Affecting Project Cost (2012)Relationship between Factors …Risk matrix for factors affecting time delay in road construction projects: owners' perspective (2011)Risk matrix for factors affec…Preliminary Study on Causative Factors Leading to Construction Cost Overrun (2011)Preliminary Study on Causativ…Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant (2010)Factors Affecting Constructio…Introduction to Factor Analysis: What It Is and How to Do It. (1980)Modelling global risk factors affecting construction cost performance (2003)Significant factors causing delay in the UAE construction industry (2006)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Causes of construction delay: traditional contracts (2002)Causes of delay in large construction projects (2006)Causes and effects of delays in Malaysian construction industry (2007)Cost overrun in the Malaysian construction industry projects: A deeper insight (2014)Causes of delays on construction projects: a comprehensive list (2019)Impact of inflation rate on construction projects budget: A review (2020)Great planning disasters (1980)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Analysis of cost and schedule performance of international development projects (2009)Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects (2015)Exploring delay causes of road construction projects in Egypt (2016)Journal of Construction Engineering and Management (1983)Causes of Delay in Large Building Construction Projects (1995)The effects of construction delays on project delivery in Nigerian construction industry (2002)Problems causing delays in major construction projects in Thailand (2008)Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey (2012)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden (2015)Strategic management of complex projects: a case study using system dynamics (2001)Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects (2006)An epistemological evaluation of research into projects and their management: Methodological issues (2007)Compressing construction durations: lessons learned from Hong Kong building projects (2002)Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling (2011)Critical success factors (CSFs) for sustainable affordable housing (2019)Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)The effect of relationship management on project performance in construction (2011)Contractors perspective toward factors affecting labor productivity in building construction (2013)Labour productivity in Iranian construction projects (2015)COMPREHENSIVE RISK MANAGEMENT USING FUZZY FMEA AND MCDA TECHNIQUES IN HIGHWAY CONSTRUCTION PROJECTS (2016)Causes of Cost Overrun In Construction (2014)Analysis of cost comparison and effects of change orders during construction: Study of a mass timber and a concrete building project (2020)
this work references cited by second hop

References

  • 2003Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study799 cited
  • 1997Factors influencing construction time and cost overruns on high-rise projects in Indonesia699 cited
  • 2008Cost escalation and schedule delays in road construction projects in Zambia599 cited
  • 2005Delays and cost increases in the construction of private residential projects in Kuwait457 cited
  • 1987The Anatomy of Major Projects303 cited
  • 2009Delays and cost overruns in the construction projects in the Gaza Strip279 cited
  • 1988Causes of High Costs of Construction in Nigeria234 cited
  • 2003World Bank Operations Evaluation Department118 cited

Cited by

  • 2010Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant131 cited
  • 2011Preliminary Study on Causative Factors Leading to Construction Cost Overrun129 cited
  • 2011Risk matrix for factors affecting time delay in road construction projects: owners' perspective122 cited
  • 2019Linking transformational leadership and “multi-dimensions” of project success113 cited
  • 2020Review of construction journals on causes of project cost overruns96 cited
  • 2017Toward a Systemic View to Cost Overrun Causation in Infrastructure Projects: A Review and Implications for Research

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

81 cited
  • 2016COST OVERRUN IN CONSTRUCTION PROJECTS IN DEVELOPING COUNTRIES, GAS-OIL INDUSTRY OF IRAN AS A CASE STUDY80 cited
  • 2018Measurement and Dependence Analysis of Cost Overruns in Megatransport Infrastructure Projects: Case Study in Hong Kong75 cited
  • 2017Critical factors affecting schedule performance72 cited
  • 2013Controlling Cost Overrun Factors in Construction Projects in Malaysia68 cited
  • 2018Engineering, Procurement, and Construction Cost and Schedule Performance Leading Indicators: State-of-the-Art Review63 cited
  • 2012Relationship between Factors of Construction Resources Affecting Project Cost62 cited
  • 2013Analysis of Cost Overrun Factors for Small Scale Construction Projects in Malaysia Using PLS-SEM Method61 cited
  • 2018Phase-based analysis of key cost and schedule performance causes and preventive strategies61 cited
  • 2019Identifying and Measuring Engineering, Procurement, and Construction (EPC) Key Performance Indicators and Management Strategies60 cited
  • 2013Modeling Causes of Cost Overrun in Large Construction Projects with Partial Least Square-SEM Approach: Contractor's Perspective59 cited