SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Design Fee versus Design Deficiency
5 references·0 citing·20 second hop
Design Fee versus Design Deficiency (1998)Design Fee versus Design DeficiencyThe Management of Quality in Construction (2002)The Management of Quality in …Causes of Quality Deviations in Design and Construction (1992)Causes of Quality Deviations …Quality in the Constructed Project : a Guide for Owners, Designers and Constructors (1990)Quality in the Constructed Pr…Improvements in Design Review Management (1988)Improvements in Design Review…Design Productivity: A Quality Problem (1988)Design Productivity: A Qualit…Work and the Nature of Man. (1967)Designing to Reduce Construction Costs (1976)THE HUMAN SIDE OF ENTERPRISE (1985)A fuzzy expert system for design performance prediction and evaluation (2001)Designing Facilities Management Needs into Infrastructure Projects: Case from a Major Hospital (2003)Relating Cost Growth from the Initial Estimate to Design Fee for Transportation Projects (2007)Industrial Project Constructability Improvement (1986)Constructability Related to TQM, Value Engineering, and Cost/Benefits (1994)INDICATORS OF DESIGN AND DOCUMENTATION DEFICIENCY (1997)Master Builder Project Delivery System and Designer Construction Knowledge (2003)Construction Claims: Frequency and Severity (1985)Measuring Design and Construction Quality Costs (1989)An exploration towards a production theory and its application to construction (2000)Quantifying the causes and costs of rework in construction (2000)Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects (2002)Measuring the Impact of Rework on Construction Cost Performance (2009)Relationship between Construction Safety and Quality Performance (2013)Total quality management in the construction process (1997)Design quality in pre-project planning: applications of the Project Definition Rating Index (2003)Design-Build Contractor Selection for Public Sustainable Buildings (2014)
this work references cited by second hop

References

  • 1992Causes of Quality Deviations in Design and Construction446 cited
  • 2002The Management of Quality in Construction106 cited
  • 1990Quality in the Constructed Project : a Guide for Owners, Designers and Constructors66 cited
  • 1988Design Productivity: A Quality Problem54 cited
  • 1988Improvements in Design Review Management45 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work