Computerized Daily Site Reporting
2 references·2 citing·14 second hop
Computerized Daily Site Reporting (1993)Computerized Daily Site ReportingFactor Model of Construction Productivity (1987)Factor Model of Construction …Construction Delay Claims (1987)Construction Delay ClaimsWeb‐based integrated project control system (2004)Web‐based integrated project …Automated Corrective Action Selection Assistant (1994)Automated Corrective Action S…Project Scheduling Using Fuzzy Set Concepts (1984)Modeling Construction Labor Productivity (1990)Causes of Quality Deviations in Design and Construction (1992)Construction Decision Support System for Delay Analysis (1993)Cost, Schedule, and Time Variances and Integration (1993)Computer aided construction delay analysis and claims preparation (1995)A model-based DSS for integrating the impact of learning in project control (2009)A Systematic Analysis of Construction Performance Management: Key Performance Indicators from 2000 to 2020 (2021)Comparison of Delay Analysis Methodologies (1998)Study of relationship between time overrunand productivity on construction sites (2011)Importance and ranking evaluation of delay factors for development construction projects in Benin (2013)Factors influencing craftsmen's productivity in Indonesia (1997)Construction Labor Productivity Modeling with Neural Networks (1998)Benchmarking of Construction Productivity (2005)
this work references cited by second hop

References

  • 1987Factor Model of Construction Productivity204 cited
  • 1987Construction Delay Claims126 cited

Cited by

  • 2004Web‐based integrated project control system43 cited
  • 1994Automated Corrective Action Selection Assistant35 cited