No open-access location is known for this record yet.
No open-access location is known for this record yet.
We consider a process control procedure with fixed sample sizes and sampling intervals, where the fraction defective is the quality variable of interest, a standard attributes control chart methodology. We show that relatively standard cost assumptions lead to formulation of the process control problem as a partially observed Markov decision process, where the posterior probability of a process shift is a sufficient statistic for decision making. We characterize features of the optimal solution and show that the optimal policy has a simple control limit structure. Numerical results are provided which indicate that the procedure may provide significant savings over non-Bayesian techniques.
Loading…
Stored only when both papers are in the corpus — 89 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.